See diagram
UWWTP_SLOVENJ GRADEC | UWWTD SIIF Slovenia National Node
Beta Version : remaining inconsistencies are possible. They will be corrected during the next reporting exercise

UWWTP_SLOVENJ GRADEC

Agglomeration view on a map with some info

UWWTP : UWWTP_SLOVENJ GRADEC - Identifier : SI_KCN_00296 - Status : Active - Connected - Reporting year : 2016
Region (NUTS) Code : SI033 - Region (NUTS) Name : SI033

compliance Time Line
List of all the year available for the agglomeration

2012

2014

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
4 092
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
20 300
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
2 443 940
Method used to determine the volume of waste water treated: 
M
Treatment performance: BOD5: 
Biological Oxygen Demand
Pass
Treatment performance: COD: 
Chemical Oxygen Demand
Pass
Treatment performance: TSS: 
Total Suspended Solids
Pass
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
NR
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
NR
Treatment performance: Other: 
e.g. e-coli
NR
Compliance: 
Not compliant
Treatment type in place: 
Secondary treatment
Treatment required: 
More stringent treatment : Nitrogen and Phosphorus
Treatment met: 
No
Performance met: 
No
In cause of failure: Bad operating/Bad design or dimensioning: 
0
In cause of failure: Bad design or dimensioning: 
0
In cause of failure: Further information on cause of failure: 
Not available
See diagram

Load and concentration per parameter :

Incoming Discharged Rate
BOD 89.6 t/year 5.5 t/year 93.9%
36.66 mg/l 2.25 mg/l
COD 538.6 t/year 43 t/year 92%
220.38 mg/l 17.59 mg/l
Nitrogen 60.1 t/year 45.1 t/year 25%
24.59 mg/l 18.45 mg/l
Phosphorus 8.3 t/year 4.1 t/year 50.6%
3.4 mg/l 1.68 mg/l
* Concentration calculated using the annual load and the annual volume of wastewater treated.
Incoming and discharged loads (t/year)
See the data table
Graphical network summary
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Linked discharge point(s): 
Site information
Characteristics
 46.53542100
 15.06855400
Date of closing: 

Not provided

Explanation for closing: 

Not provided

ID of the successor: 

Not provided

Primary treatment: 
Yes
Secondary treatment: 
Yes
N removal: 
No
P removal: 
No
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
No
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
No
Remarks: 

Not provided

Forward looking aspect
Identified reason(s) for non compliance: 
Odsotnost terciarnega čiščenja, optimizacija tehnoloških procesov na KČN
Measure(s) to reach the compliance needed for UWWTP: 
Tehnološka dopolnitev čistilne naprave s terciarnim čiščenjem na napravi.
Load entering the UWWTP at the expected date of compliance (as planned): 
12000
Organic design capacity UWWTP (as planned): 
20300
Type of treatment UWWTP (as planned): 
3NP
Date or expected date of completion of preparatory measures (planning, design, etc): 
01 March 2016
Date or expected start date for works: 
01 April 2016
Date or expected date of completion of works: 
01 December 2018
Expected date of compliance (12 months of compliant samples) : 
01 December 2019
Forecast cost investment needed for the UWWTP (as in the national plan): 
0.05
Amount of (planned) EU funding needed: 
0.00