UWWTP_ZAGORJE OB SAVI

Agglomeration view on a map with some info

UWWTP : UWWTP_ZAGORJE OB SAVI - Identifier : SI_KCN_00272 - Status : Active - Connected - Reporting year : 2016
Region (NUTS) Code : SI035 - Region (NUTS) Name : SI035

compliance Time Line
List of all the year available for the agglomeration

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
2 908
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
11 000
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
913 120
Method used to determine the volume of waste water treated: 
M
Treatment performance: BOD5: 
Biological Oxygen Demand
Pass
Treatment performance: COD: 
Chemical Oxygen Demand
Pass
Treatment performance: TSS: 
Total Suspended Solids
Pass
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
Pass
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
Pass
Treatment performance: Other: 
e.g. e-coli
NR
Compliance: 
Compliant
Treatment type in place: 
More stringent treatment
Treatment required: 
Secondary treatment
Treatment met: 
Yes
Performance met: 
Yes
In cause of failure: Bad operating/Bad design or dimensioning: 
0
In cause of failure: Bad design or dimensioning: 
0
In cause of failure: Further information on cause of failure: 
Not available
See diagram

Load and concentration per parameter :

Incoming Discharged Rate
BOD 63.7 t/year 2.6 t/year 95.9%
69.76 mg/l 2.85 mg/l
COD 299.7 t/year 19.1 t/year 93.6%
328.22 mg/l 20.92 mg/l
Nitrogen 31.4 t/year 2.6 t/year 91.7%
34.39 mg/l 2.85 mg/l
Phosphorus 4.4 t/year 0.8 t/year 81.8%
4.82 mg/l 0.88 mg/l
* Concentration calculated using the annual load and the annual volume of wastewater treated.
Incoming and discharged loads (t/year)
See the data table
Graphical network summary
Network
Agglomerations : 2 Agglomeration : SI_LOKE PRI ZAGORJU_7514
(GeneratedAgglomeration : SI_ZAGORJE OB SAVI_7622
(Generated
Network
Network
Entering :
2,908 p.e
Network
N
Network
P
Network
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked receiving area(s): 
Linked discharge point(s): 
Site information
Characteristics
 46.11823300
 14.99488000
Date of closing: 

Not provided

Explanation for closing: 

Not provided

ID of the successor: 

Not provided

Primary treatment: 
Yes
Secondary treatment: 
Yes
N removal: 
Yes
P removal: 
Yes
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
No
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
No
Remarks: 

Not provided

Forward looking aspect
Identified reason(s) for non compliance: 
Odsotnost čistilne naprave
Measure(s) to reach the compliance needed for UWWTP: 
Izgradnja kanalizacije in čistilne naprave v občini Zagorje ob Savi
Load entering the UWWTP at the expected date of compliance (as planned): 
10365
Organic design capacity UWWTP (as planned): 
11000
Type of treatment UWWTP (as planned): 
3NP
Date or expected date of completion of preparatory measures (planning, design, etc): 
14 December 2010
Date or expected start date for works: 
01 October 2013
Date or expected date of completion of works: 
01 March 2015
Expected date of compliance (12 months of compliant samples) : 
01 March 2016
Forecast cost investment needed for the UWWTP (as in the national plan): 
3.51
Name of EU fund planned to be used UWWTP (if any): 
CF
Amount of (planned) EU funding needed: 
2.34