See diagram
UWWTP_DOMŽALE-KAMNIK | UWWTD SIIF Slovenia National Node
Beta Version : remaining inconsistencies are possible. They will be corrected during the next reporting exercise

UWWTP_DOMŽALE-KAMNIK

Agglomeration view on a map with some info

UWWTP : UWWTP_DOMŽALE-KAMNIK - Identifier : SI_KCN_00099 - Status : Active - Connected - Reporting year : 2016
Region (NUTS) Code : SI041 - Region (NUTS) Name : SI041

compliance Time Line
List of all the year available for the agglomeration

2012

2014

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
67 575
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
200 000
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
7 061 848
Method used to determine the volume of waste water treated: 
M
Treatment performance: BOD5: 
Biological Oxygen Demand
Pass
Treatment performance: COD: 
Chemical Oxygen Demand
Pass
Treatment performance: TSS: 
Total Suspended Solids
Pass
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
NR
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
NR
Treatment performance: Other: 
e.g. e-coli
NR
Compliance: 
Not compliant
Treatment type in place: 
Secondary treatment
Treatment required: 
More stringent treatment : Nitrogen and Phosphorus
Treatment met: 
No
Performance met: 
No
In cause of failure: Bad operating/Bad design or dimensioning: 
0
In cause of failure: Bad design or dimensioning: 
0
In cause of failure: Further information on cause of failure: 
Not available
See diagram

Load and concentration per parameter :

Incoming Discharged Rate
BOD 1479.9 t/year 30.1 t/year 98%
209.56 mg/l 4.26 mg/l
COD 3098.6 t/year 228.6 t/year 92.6%
438.78 mg/l 32.37 mg/l
Nitrogen 272.8 t/year 67.4 t/year 75.3%
38.63 mg/l 9.54 mg/l
Phosphorus 35.5 t/year 13.8 t/year 61.1%
5.03 mg/l 1.95 mg/l
* Concentration calculated using the annual load and the annual volume of wastewater treated.
Incoming and discharged loads (t/year)
See the data table
Graphical network summary
Network
Agglomerations : 9 Agglomeration : SI_CERKLJE_3943
(GeneratedAgglomeration : SI_KOMENDA_4079
(GeneratedAgglomeration : SI_ŽELODNIK_4093
(GeneratedAgglomeration : SI_DOMŽALE_4115
(GeneratedAgglomeration : SI_ZGORNJE STRANJE_4613
(GeneratedAgglomeration : SI_KAMNIK_20002
(GeneratedAgglomeration : SI_RADOMLJE_20003
(GeneratedAgglomeration : SI_MENGEŠ_20004
(GeneratedAgglomeration : SI_TRZIN_20005
(Generated
Network
Network
Entering :
67,575 p.e
Network
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Site information
Characteristics
 46.11766300
 14.60976100
Date of closing: 

Not provided

Explanation for closing: 

Not provided

ID of the successor: 

Not provided

Primary treatment: 
Yes
Secondary treatment: 
Yes
N removal: 
No
P removal: 
No
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
No
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
No
Remarks: 

Not provided

Forward looking aspect
Identified reason(s) for non compliance: 
Odsotnost terciarne stopnje čiščenja
Measure(s) to reach the compliance needed for UWWTP: 
Odvajanje in čiščenje odpadne vode na območju Domžale-Kamnik, Nadgradnja CČN Domžale-Kamnik
Load entering the UWWTP at the expected date of compliance (as planned): 
131000
Organic design capacity UWWTP (as planned): 
149000
Type of treatment UWWTP (as planned): 
3NP
Date or expected date of completion of preparatory measures (planning, design, etc): 
01 June 2014
Date or expected start date for works: 
01 July 2014
Date or expected date of completion of works: 
01 August 2016
Expected date of compliance (12 months of compliant samples) : 
01 August 2017
Forecast cost investment needed for the UWWTP (as in the national plan): 
15.44
Name of EU fund planned to be used UWWTP (if any): 
CF
Amount of (planned) EU funding needed: 
11.34