Agglomeration view on a map with some info UWWTP : UWWTP_GAMELJNE - Identifier : SI_KCN_00088 - Status : Active - Connected - Reporting year : 2018 Region (NUTS) Code : SI041 - Region (NUTS) Name : SI041 compliance Time Line List of all the year available for the agglomeration 2012201420162018View history Compliant Not compliant Not relevant No information ? Description Load entering UWWTP (p.e.): load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)1 312Method used to determine the load : Not availableRate of entering load transported to this UWWTP by trucks (%): Not availablePhysical Capacity (p.e.): 1 500Waste water treated (m3/y): Volume of waste water treated and partially treated in the UWWTP98 550Method used to determine the volume of waste water treated: MTreatment performance: BOD5: Biological Oxygen DemandPassTreatment performance: COD: Chemical Oxygen DemandPassTreatment performance: TSS: Total Suspended SolidsPassTreatment performance: Total nitrogen: Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitriteNRTreatment performance: Total phosphorus: Sum of dissolved phosphorus and insoluble phosphorusNRTreatment performance: Other: e.g. e-coliNRCompliance: CompliantTreatment type in place: Secondary treatmentTreatment required: Secondary treatmentTreatment met: YesPerformance met: YesIn cause of failure: Bad operating/Bad design or dimensioning: 0In cause of failure: Bad design or dimensioning: 0In cause of failure: Further information on cause of failure: Not available Load and concentration per parameter : Incoming Discharged Rate BOD 28.7 t/year 0.6 t/year 97.9% 291.22 mg/l 6.09 mg/l COD 54.6 t/year 1.8 t/year 96.7% 554.03 mg/l 18.26 mg/l Nitrogen 5.3 t/year 0.6 t/year 88.7% 53.78 mg/l 6.09 mg/l Phosphorus 0.9 t/year 0.3 t/year 66.7% 9.13 mg/l 3.04 mg/l * Concentration calculated using the annual load and the annual volume of wastewater treated. Incoming and discharged loads (t/year) Graphical network summary Agglomerations : 1 Agglomeration : SI_ZGORNJE GAMELJNE_3637 (Generated UWWTP_GAMELJNE Entering :1,312 p.e 1 DCP(S)Discharge point: SI_DP_UWWTP_GAMELJNEVT Sava Medvode – Podgrad(CSA) Main treatment : : Compliant : Not compliant : No information / Not relevant More stringent treatment : Performance : : Pass performance : Fail performance : Not relevant Type : N : Nitrogen removal P : Phosphorus removal UV : UV treatment MICRO : Micro Filtration Type : CHLOR : Chlorination OZONE : Ozonation SAND : Sand filtration O : Other more stringent Discharge point : : Discharge point DCP(S) : Discharge point(s) Waste Water Network Connexions Linked agglomeration(s): SI_ZGORNJE GAMELJNE_3637Linked receiving area(s): VT Sava Medvode – PodgradLinked discharge point(s): SI_DP_UWWTP_GAMELJNE Site information Year of data: 2018 Source of data: See sourcefile Other years : Year of data: 2016 Source of data: See sourcefile Year of data: 2014 Source of data: See sourcefile Year of data: 2012 Source of data: See sourcefile UWWTP national Internet hyperlink: Not available Characteristics Latitude : 46.11930200 Longitude : 14.50303200 Date of closing: Not providedExplanation for closing: Not providedID of the successor: Not providedPrimary treatment: Secondary treatment: N removal: P removal: UV: Ozonation: Sand filtration: Chlorination: Micro filtration: Other treatment: Other type of more stringent treatment: Not providedOther type of more stringent : Not providedID of E-PRTR facility: Not providedAccidents: Remarks: Not provided Forward looking aspect Identified reason(s) for non compliance: Investicijsko vzdrževanjeMeasure(s) to reach the compliance needed for UWWTP: Investicijsko vzdrževanjeLoad entering the UWWTP at the expected date of compliance (as planned): 1500Organic design capacity UWWTP (as planned): 1500Type of treatment UWWTP (as planned): 2Date or expected date of completion of preparatory measures (planning, design, etc): 01 January 2016Date or expected start date for works: 01 January 2016Date or expected date of completion of works: 01 January 2021Expected date of compliance (12 months of compliant samples) : 01 January 2021Forecast cost investment needed for the UWWTP (as in the national plan): 0.01 Errors: Not provided