See diagram
UWWTP_RADENCI | UWWTD SIIF Slovenia National Node
Beta Version : remaining inconsistencies are possible. They will be corrected during the next reporting exercise

UWWTP_RADENCI

Agglomeration view on a map with some info

UWWTP : UWWTP_RADENCI - Identifier : SI_KCN_00067 - Status : Active - Connected - Reporting year : 2016
Region (NUTS) Code : SI031 - Region (NUTS) Name : SI031

compliance Time Line
List of all the year available for the agglomeration

2012

2014

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
5 105
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
9 500
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
472 436
Method used to determine the volume of waste water treated: 
M
Treatment performance: BOD5: 
Biological Oxygen Demand
Pass
Treatment performance: COD: 
Chemical Oxygen Demand
Pass
Treatment performance: TSS: 
Total Suspended Solids
Fail
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
NR
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
NR
Treatment performance: Other: 
e.g. e-coli
NR
Compliance: 
Compliant
Treatment type in place: 
Secondary treatment
Treatment required: 
Secondary treatment
Treatment met: 
Yes
Performance met: 
Yes
In cause of failure: Bad operating/Bad design or dimensioning: 
1
In cause of failure: Bad design or dimensioning: 
0
In cause of failure: Further information on cause of failure: 
Not available
See diagram

Load and concentration per parameter :

Incoming Discharged Rate
BOD 111.8 t/year 10.5 t/year 90.6%
236.65 mg/l 22.23 mg/l
COD 359.1 t/year 33.5 t/year 90.7%
760.1 mg/l 70.91 mg/l
Nitrogen 21.9 t/year 8.8 t/year 59.8%
46.36 mg/l 18.63 mg/l
Phosphorus 4.2 t/year 1.5 t/year 64.3%
8.89 mg/l 3.18 mg/l
* Concentration calculated using the annual load and the annual volume of wastewater treated.
Incoming and discharged loads (t/year)
See the data table
Graphical network summary
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Linked receiving area(s): 
Linked discharge point(s): 
Site information
Characteristics
 46.64163800
 16.05093400
Date of closing: 

Not provided

Explanation for closing: 

Not provided

ID of the successor: 

Not provided

Primary treatment: 
Yes
Secondary treatment: 
Yes
N removal: 
No
P removal: 
No
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
No
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
No
Remarks: 

Not provided

Forward looking aspect
Identified reason(s) for non compliance: 
Zastarelost, pomanjkljvo obratovanje, odsotnost terciarnega čiščenja, investicijsko vzdrževanje
Measure(s) to reach the compliance needed for UWWTP: 
Odvajanje in čiščenje odpadne vode v porečju Mure 3. sklop Občina Radenci; investicijsko vzdrževanje
Load entering the UWWTP at the expected date of compliance (as planned): 
6500
Organic design capacity UWWTP (as planned): 
8600
Type of treatment UWWTP (as planned): 
3NP
Date or expected date of completion of preparatory measures (planning, design, etc): 
01 July 2013
Date or expected start date for works: 
01 January 2014
Date or expected date of completion of works: 
01 December 2017
Expected date of compliance (12 months of compliant samples) : 
01 December 2018
Forecast cost investment needed for the UWWTP (as in the national plan): 
5.98
Name of EU fund planned to be used UWWTP (if any): 
CF
Amount of (planned) EU funding needed: 
3.71