Beta Version : remaining inconsistencies are possible. They will be corrected during the next reporting exercise

SI_CERKLJE_3943

Agglomeration view on a map with some info

Agglomeration : SI_CERKLJE_3943 - Identifier : SI03943 - Status : Active - Reporting year : 2016
Region (NUTS) Code : SI042 - Region (NUTS) Name : SI042

compliance Time Line
List of all the year available for the agglomeration

2012

2014

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
See diagram
Generated load (p.e.): 
Load generated by the agglomeration. It Includes load generated by resident and non-resident population (e.g. tourism), industrial and tertiary sectors connected to collecting system, rain under normal climatic conditions. It integrates Individual or Appropriate systems and seasonal variation.
2 846
Connected to collecting system: 
0.1 % (3 p.e.) based on estimated method
Individual or Appropriate Systems (IAS): 
99.9 % (2,843 p.e.) based on estimated method
Discharged without treatment: 
0.0 % (0 p.e.) based on calculated method
Methods used for calculation of the generated load: 
General calculation scheme ( industry+inhabitants*weighting factor)
Significant changes of the generated load : 
false
Comments on significant changes: 

Not provided

Remarks: 

Not provided

Generated Load by collection type in population equivalent
See the data table
Compliance: 
Compliants
Connection compliance: 
Connection to "collecting system" or "Individual or appropriate system" as requested by Article 3 of the Urban Waste Water Treatment directive 91/271/EC
Compliant
2nd treatment compliance: 
Compliant
3rd treatment compliance: 
Not relevant
Article 6 compliance: 
Primary treatment
Not relevant
Distance to target:
The distance to target concept present the rate of waste water load that is:
  • adequately connected to a centralised urban waste water collecting system or addressed via Individual or Appropriate System (IAS)
and then when collected:
  • treated at an adequate level (secondary or more stringent treatment) as required by the directive,
  • and with the performance requirements under tables 1 or 2 of the annex I of Directive 91/271/EEC, (UWWTD).
When countries joined the EU, they have obtained a delay to implement the Directive. In such case the deadline for implementing the above (see in section characteristics) may be different, and if the above is not already implemented for the agglomeration it is identified with orange colour in the table.
Equipment Performance
Collection 0.0%
0 p.e
2nd treatment 0,0% 0,0%
0 p.e 0 p.e
3rd treatment - -
- -
Graphical network summary
Individual And Appropriate Systems: 2,843 p.e (99.9%)
Network
Network
SI_CERKLJE_3943
Generated load : 2,846 p.e
Collecting system :
3 p.e
(0.1%)
Network
Network
Load entering from:
SI_CERKLJE_3943
3 p.e (0.1%) 1
Network
Network
Discharge without treatment: 0 p.e (0.0%)

Network
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • Other : Other more stringent
  • UV : UV treatment

    Type :
  • OZONE : Ozonation
  • SAND : Sand filtration
  • MICRO : Micro Filtration
  • CHLOR : Chlorination
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
  • 1: value based on estimated method
Waste Water Network Connexions
Linked Treatment Plant(s): 
Linked discharge points: 
Linked receiving areas: 
ID of the big city/ big discharger: 

Not provided

Linked Big city(ies): 

Not provided

Site information
Characteristics
 46.25629000
 14.48711500
Name of municipalities/communes of this agglomeration: 

Not provided

Agglomeration begin life: 
Not available
Agglomeration end life: 

-

Deadline connection compliance: 
Deadline as regards the connection to "collecting system" or "Individual or appropriate system" as requested by Article 3 of the Urban Waste Water Treatment directive 91/271/EC
31/12/2015
Deadline 2nd treatment compliance: 
Deadline as regards the secondary treatment in place and performance met as requested by Article 4 and Annex I.B of the Urban Waste Water Treatment directive 91/271/EC
31/12/2015
Deadline 3rd treatment compliance: 
when agggenerated < 10000 set to Nor Relevant
Not Relevant
Type of sewage network: 
separated/combine/separated and combine
Not available
Leaks registration: 
Is a registration system for leaks in place?
false
Maintenance plan: 
Is a maintenance plan (quality assurance) in place?
false
ID of the successor: 

Not provided

Indicate number of overflows: 
Not available
How much raw sewage has been discharged through combined sewer overflows (CSOs) in the year reported: p.e.: 

Not provided

How much raw sewage has been discharged through combined sewer overflows (CSOs) in the year reported: m3/y: 

Not provided

What are the measures based on: Acceptable number of overflows per year: 
No
What are the measures based on: Capacity in relation to dry weather flow: 
No
What are the measures based on: Dilution rates: 
No
IAS - in situ and/ or transported to UWWTPs by trucks: How much in % of generated load of agglomeration with more stringent trea: 
0.00 %
IAS - in situ and/ or transported to UWWTPs by trucks: How much in % of generated load of agglomeration with primary treatment: 
0.00 %
IAS - in situ and/or transported to UWWTPs by trucks: How much in % of generated load of agglomeration with secondary treatment: 
100.00 %
Is best technical knowledge to limit pollution applied?: 
false
Pressure test: 
No
Video inspection: 
No
Other measures: 
No
Short explanation of other measures: 

Not provided

Forward looking aspect
Identified reason(s) for non compliance: 
Aglomeracija je preliminarno ocenjena kot skladna
Measure(s) foreseen to reach compliance with Article 3 (collecting systems and IAS): 
Izgradnja kanalizacijskega omrežja
Date or expected date for completion of preparatory measures for the collecting system or IAS (planning, design, procurement, c: 
01 September 2014
Start date or expected start date for works on the collecting systems or IAS: 
01 October 2014
Expected date of completion of the collecting system or IAS works: 
01 December 2019
Forecast investment cost for the collecting system or IAS (as in the national plan): 
1.87
Theorical compliance for art 5 if the Art 5.2,3 was applied: 
Theorical compliance for art 5 if the Art 5.2,3 was applied

Not provided