Viseu Sul

Agglomeration view on a map with some info

UWWTP : Viseu Sul - Identifier : PTAGL014tp01 - Status : Active - Connected - Reporting year : 2016
Region (NUTS) Code : PT16G - Region (NUTS) Name : PT16G

compliance Time Line
List of all the year available for the agglomeration

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
73 900
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
90 000
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
Not available
Method used to determine the volume of waste water treated: 
Not available
Treatment performance: BOD5: 
Biological Oxygen Demand
Pass
Treatment performance: COD: 
Chemical Oxygen Demand
Pass
Treatment performance: TSS: 
Total Suspended Solids
NR
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
Fail
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
Fail
Treatment performance: Other: 
e.g. e-coli
Not available
Compliance: 
Not compliant
Treatment type in place: 
More stringent treatment
Treatment required: 
More stringent treatment : Phosphorus
Treatment met: 
Yes
Performance met: 
No
In cause of failure: Bad operating/Bad design or dimensioning: 
Not available
In cause of failure: Bad design or dimensioning: 
Not available
In cause of failure: Further information on cause of failure: 
Not available
Graphical network summary
Network
Agglomerations : 1 Agglomeration : Viseu
(Generated
Network
Network
Entering :
73,900 p.e
Network
N
Network
P
Network
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Linked receiving area(s): 
Linked discharge point(s): 
Site information
Characteristics
 40.59887300
 -7.98077400
Date of closing: 

Not provided

Explanation for closing: 

Not provided

ID of the successor: 

Not provided

Primary treatment: 
Yes
Secondary treatment: 
Yes
N removal: 
Yes
P removal: 
Yes
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
No
Micro filtration: 
Yes
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
Not available
Remarks: 
New TP became operational in january 2016. Complies N and P since june.
Forward looking aspect
Identified reason(s) for non compliance: 
A ETAR de Viseu Sul entrou em fase inicial de arranque em janeiro de 2016. Não cumpre relativamente aos parâmetros N e P. A aglomeração de Viseu cumpre desde junho de 2016, tendo cumprido em 2017.
Measure(s) to reach the compliance needed for UWWTP: 
Em fase de arranque.
Load entering the UWWTP at the expected date of compliance (as planned): 
73900
Organic design capacity UWWTP (as planned): 
90000
Type of treatment UWWTP (as planned): 
3NP
Date or expected date of completion of preparatory measures (planning, design, etc): 
31 December 2012
Date or expected start date for works: 
31 December 2012
Date or expected date of completion of works: 
01 January 2016
Expected date of compliance (12 months of compliant samples) : 
30 June 2016
Forecast cost investment needed for the UWWTP (as in the national plan): 
12.26
Any relevant comment on UWWTP: 
Medida PTE1P01M39_SUP_RH4_1Ciclo do PGRH - Execução da ETAR Viseu Sul, no concelho de Viseu. As datas previstas para finalizar as medidas preparatórias e para iniciar as obras foram estimadas para efeito de reporte.