UWWTP : Portinho da Costa - Identifier : PT7071950 - Status : Active - Connected - Reporting year : 2016
Region (NUTS) Code : PT170 - Region (NUTS) Name : PT170

compliance Time Line
List of all the year available for the agglomeration

2012

2014

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
87 200
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
140 000
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
Not available
Method used to determine the volume of waste water treated: 
Not available
Treatment performance: BOD5: 
Biological Oxygen Demand
Pass
Treatment performance: COD: 
Chemical Oxygen Demand
Pass
Treatment performance: TSS: 
Total Suspended Solids
NR
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
NR
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
NR
Treatment performance: Other: 
e.g. e-coli
Not available
Compliance: 
Not compliant
Treatment type in place: 
Secondary treatment
Treatment required: 
More stringent treatment - Other
Treatment met: 
No
Performance met: 
Yes
In cause of failure: Bad operating/Bad design or dimensioning: 
Not available
In cause of failure: Bad design or dimensioning: 
Not available
In cause of failure: Further information on cause of failure: 
Not available
See diagram

Load and concentration per parameter :

Incoming Discharged Rate
BOD 60.22 t/year
COD 147.08 t/year
Nitrogen 116.75 t/year
Phosphorus 8.58 t/year
* Concentration calculated using the annual load and the annual volume of wastewater treated.
Incoming and discharged loads (t/year)
See the data table
Graphical network summary
Network
Network
Entering :
87,200 p.e
Network
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Linked receiving area(s): 
Linked discharge point(s): 
Site information
Characteristics
 38.67477676
 -9.22040137
Date of closing: 

Not provided

Explanation for closing: 

Not provided

ID of the successor: 

Not provided

Primary treatment: 
Yes
Secondary treatment: 
Yes
N removal: 
No
P removal: 
No
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
No
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
Not available
Remarks: 

Not provided

Forward looking aspect
Identified reason(s) for non compliance: 
A descarga da ETAR é efetuada em zona sensível do estuário do Tejo, classificada pelo critério c) devido à produção de bivalves, mas a ETAR não dispõe de etapa de desinfeção para a totalidade do efluente mas apenas para o efluente reutilizado em usos compatíveis.
Measure(s) to reach the compliance needed for UWWTP: 
Implementação da operação de desinfeção para a totalidade do efluente da ETAR. O perfil hidráulico da ETAR não permitiria a adoção de uma operação de desinfeção por UV, sem recurso ao bombeamento de todo o caudal. Os SMAS de Almada já foram notificados para aoresentar no prazo de 3 meses um estudo/projeto para remodelação e implementação da etapa de desinfeção.
Load entering the UWWTP at the expected date of compliance (as planned): 
87200
Organic design capacity UWWTP (as planned): 
140000
Type of treatment UWWTP (as planned): 
3m
Date or expected date of completion of preparatory measures (planning, design, etc): 
31 December 2018
Date or expected start date for works: 
01 January 2021
Date or expected date of completion of works: 
31 December 2021
Expected date of compliance (12 months of compliant samples) : 
31 December 2022
Forecast cost investment needed for the UWWTP (as in the national plan): 
0.00
Any relevant comment on UWWTP: 
A ETAR dispõe de gradagem de 3 mm; elevação de caudal a 11 mca; remoção de areias, óleos e gorduras, tratamento físico-químico e decantação primária lamelar num só orgão; tratamento biológico por biomassa fixa em biofiltros; reserva de efluente e desinfecção para usos compatíveis; afinação e descarga final por emissário submarino com difusores no rio Tejo.(site dos SMAS Almada). A data prevista para iniciar as obras foi estimada para efeito de reporte.