Alcanena | European Commission urban waste water website: Portugal

Alcanena

Agglomeration view on a map with some info

UWWTP : Alcanena - Identifier : PT7032766 - Status : Active - Connected - Reporting year : 2016
Region (NUTS) Code : PT16I - Region (NUTS) Name : PT16I

compliance Time Line
List of all the year available for the agglomeration

2012

2014

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
400 000
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
400 000
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
Not available
Method used to determine the volume of waste water treated: 
Not available
Treatment performance: BOD5: 
Biological Oxygen Demand
Pass
Treatment performance: COD: 
Chemical Oxygen Demand
Fail
Treatment performance: TSS: 
Total Suspended Solids
NR
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
NR
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
NR
Treatment performance: Other: 
e.g. e-coli
Not available
Compliance: 
Not compliant
Treatment type in place: 
Secondary treatment
Treatment required: 
Secondary treatment
Treatment met: 
Yes
Performance met: 
No
In cause of failure: Bad operating/Bad design or dimensioning: 
Not available
In cause of failure: Bad design or dimensioning: 
Not available
In cause of failure: Further information on cause of failure: 
Not available
See diagram

Load and concentration per parameter :

Incoming Discharged Rate
BOD 48.06 t/year
COD 492.35 t/year
Nitrogen 156.23 t/year
Phosphorus 2.84 t/year
* Concentration calculated using the annual load and the annual volume of wastewater treated.
Incoming and discharged loads (t/year)
See the data table
Graphical network summary
Network
Agglomerations : 1 Agglomeration : Alcanena
(Generated
Network
Network
Entering :
400,000 p.e
Network
reseau
1 DCP(S)
Discharge point: PD_Alcanena
(NA)

    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Linked receiving area(s): 
Not available
Linked discharge point(s): 
Site information
Characteristics
 39.44881000
 -8.66853000
Date of closing: 

Not provided

Explanation for closing: 

Not provided

ID of the successor: 

Not provided

Primary treatment: 
Yes
Secondary treatment: 
Yes
N removal: 
No
P removal: 
No
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
No
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
Not available
Remarks: 
TP will be in rehabilitation works
Forward looking aspect
Identified reason(s) for non compliance: 
Mau funcionamento e rede coletora mal dimensionada. Em 2014 não cumpriu relativamente aos parâmetros CBO5 e CQO. Em 2016 não cumpriu relativamente ao parâmetro CBO5.
Measure(s) to reach the compliance needed for UWWTP: 
Remodelação da ETAR. No entanto, esta obra que não se repercutiu logo no cumprimento porque a rede de coletores a montante só entrou em funcionamento no início de 2016, após remodelação. Decorreram, até ao último trimestre de 2016, ajustes técnicos no processo de tratamento, que recebe afluente doméstico e industrial. Estão previstas mais intervenções na ETAR de forma a colocar a linha de tratamento terciário em funcionamento, aumentando assim a eficiência de tratamento da ETAR.
Load entering the UWWTP at the expected date of compliance (as planned): 
400000
Organic design capacity UWWTP (as planned): 
400000
Type of treatment UWWTP (as planned): 
2
Date or expected date of completion of preparatory measures (planning, design, etc): 
30 June 2018
Date or expected start date for works: 
30 June 2018
Date or expected date of completion of works: 
31 December 2018
Expected date of compliance (12 months of compliant samples) : 
31 December 2019
Forecast cost investment needed for the UWWTP (as in the national plan): 
2.75
Any relevant comment on UWWTP: 
Medida PTE1P1M37_SUP_RH5 do PGRH - Melhoria da eficiência do sistema de tratamento da ETAR de Alcanena - Projeto Alviela.A data prevista para finalizar as medidas preparatórias foi estimada para efeito de reporte.