See diagram
Quinta da Bomba | European Commission urban waste water website: Portugal

Quinta da Bomba

Agglomeration view on a map with some info

UWWTP : Quinta da Bomba - Identifier : PT18042219 - Status : Active - Connected - Reporting year : 2016
Region (NUTS) Code : PT170 - Region (NUTS) Name : PT170

compliance Time Line
List of all the year available for the agglomeration

2012

2014

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
142 900
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
198 290
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
Not available
Method used to determine the volume of waste water treated: 
Not available
Treatment performance: BOD5: 
Biological Oxygen Demand
Fail
Treatment performance: COD: 
Chemical Oxygen Demand
Fail
Treatment performance: TSS: 
Total Suspended Solids
NR
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
NR
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
NR
Treatment performance: Other: 
e.g. e-coli
Not available
Compliance: 
Not compliant
Treatment type in place: 
More stringent treatment
Treatment required: 
Secondary treatment
Treatment met: 
Yes
Performance met: 
No
In cause of failure: Bad operating/Bad design or dimensioning: 
Not available
In cause of failure: Bad design or dimensioning: 
Not available
In cause of failure: Further information on cause of failure: 
Not available
See diagram

Load and concentration per parameter :

Incoming Discharged Rate
BOD 2159.94 t/year
COD 3839.33 t/year
Nitrogen
Phosphorus
* Concentration calculated using the annual load and the annual volume of wastewater treated.
Incoming and discharged loads (t/year)
See the data table
Graphical network summary
Network
Agglomerations : 1 Agglomeration : Corroios/Quinta da Bomba
(Generated
Network
Network
Entering :
142,900 p.e
Network
UV
Network
SAND
Network
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Linked receiving area(s): 
Linked discharge point(s): 
Site information
Characteristics
 38.64723300
 -9.14180300
Date of closing: 

Not provided

Explanation for closing: 

Not provided

ID of the successor: 

Not provided

Primary treatment: 
Yes
Secondary treatment: 
Yes
N removal: 
No
P removal: 
No
UV: 
Yes
Ozonation: 
No
Sand filtration: 
Yes
Chlorination: 
No
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
Not available
Remarks: 
TP was in rehabilitation works until July 2016
Forward looking aspect
Identified reason(s) for non compliance: 
ETAR obsoleta. Não cumpriu relativamente aos parâmetros CBO5 e CQO.
Measure(s) to reach the compliance needed for UWWTP: 
A ETAR foi remodelada mas apenas iniciou o pré-arranque em julho de 2016.
Load entering the UWWTP at the expected date of compliance (as planned): 
141600
Organic design capacity UWWTP (as planned): 
198290
Type of treatment UWWTP (as planned): 
3m
Date or expected date of completion of preparatory measures (planning, design, etc): 
01 October 2011
Date or expected start date for works: 
01 October 2011
Date or expected date of completion of works: 
31 July 2016
Expected date of compliance (12 months of compliant samples) : 
31 July 2017
Forecast cost investment needed for the UWWTP (as in the national plan): 
11.38
Name of EU fund planned to be used UWWTP (if any): 
FC
Amount of (planned) EU funding needed: 
5.02
Any relevant comment on UWWTP: 
Cofinanciamento comunitário aprovado no âmbito do POVT (QREN). Medida PTE1P01M70_SU+P_RH5_1Ciclo do PGRH - Remodelação da ETAR da Quinta da Bomba, na freguesia de Corroios e concelho do Seixal. A data prevista para finalizar as medidas preparatórias foi estimada para efeito de reporte.