Beta Version : remaining inconsistencies are possible. They will be corrected during the next reporting exercise

Torrao

UWWTP : Torrao - Identifier : PT6031771 - Status : Active - Reporting year : 2014
Region (NUTS) Code: PT16J - Region (NUTS) Name : PT16J

Compliance timeline

2012

2014

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description 2014
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
3 500
Physical Capacity (p.e.): 
3 925
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP

Not provided

Treatment performance :
Treatment performance: BOD5: 
Biological Oxygen Demand
Fail
Treatment performance: COD: 
Chemical Oxygen Demand
Fail
Treatment performance: TSS: 
Total Suspended Solids
NR
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
NR
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
NR
Treatment performance: Other: 
e.g. e-coli

Not provided

Compliance: 
Not Compliant
Treatment type in place: 
Secondary treatment
Treatment required: 
Secondary treatment
Treatment met: 
Yes
Performance met: 
No








Graphical network summary
reseau
Agglomerations : 1 Agglomeration : Torrao
(Generated : 3,500 p.e)
reseau
reseau
Entering :
3,500 p.e
reseau
    Main treatment :
  • reseau : Compliant
  • reseau : Not compliant
  • reseau : No information / Not relevant
    More stringent treatment :
    Performance :
  • reseau : Pass performance
  • reseau : Fail performance
  • reseau : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • reseau : Discharge point
  • DCP(S) : Discharge point(s)
Characteristics
 40.51000000
 -7.27000000

Treatment in place :

Primary treatment: 
Yes
Secondary treatment: 
Yes

More stringent treatment :

N removal: 
No
P removal: 
No
UV: 
No
Chlorination: 
No
Ozonation: 
No
Sand filtration: 
No
Micro filtration: 
No
Other treatment: 
No
Waste Water Network Connexions
Linked agglomeration(s): 
Linked discharge point(s): 
Linked receiving area(s): 
Site information
Year of data: 
2014
Source of data: 

Other year :
Year of data: 2012
Source of data: file See sourcefile
Forward looking aspect
Identified reason(s) for non compliance: 
ETAR obsoleta e grande afluência de água residual com características industriais. Não cumpriu relativamente aos parâmetros CBO5 e CQO.
Measure(s) to reach the compliance needed for UWWTP: 
A remodelação da ETAR encontra-se em fase de conclusão do relatório final de avaliação das propostas.
Load entering the UWWTP at the expected date of compliance (as planned): 
7000
Organic design capacity UWWTP (as planned): 
10000
Type of treatment UWWTP (as planned): 
2
Date or expected start date for works: 
31 December 2016
Date or expected date of completion of works: 
31 March 2018
Expected date of compliance (12 months of compliant samples) : 
31 December 2019
Forecast cost investment needed for the UWWTP (as in the national plan): 
1500
Name of EU fund planned to be used UWWTP (if any): 
FC
Amount of (planned) EU funding needed: 
1275
Any relevant comment on UWWTP: 
Candidatura ao POSEUR aprovada em 21-03-2016. Medida PTE1P01M23_SUP_RH3 do PGRH - Controlo e redução da poluição tópica urbana – Remodelação da ETAR do Torrão (concelho da Guarda).