Ponte do Reguengo

Agglomeration : Ponte do Reguengo - Identifier : PTAGL363 - Status : Active - Reporting year : 2014
Region (NUTS) Code : PT185 - Region (NUTS) Name : Lezíria do Tejo

Compliance timeline

2012

2014

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description 2014
See diagram
Generated load (p.e.): 
Load generated by the agglomeration. It Includes load generated by resident and non-resident population (e.g. tourism), industrial and tertiary sectors connected to collecting system, rain under normal climatic conditions. It integrates Individual or Appropriate systems and seasonal variation.
3 000
Connected to collecting system: 
Rate of generated load of agglomeration collected through collecting system (% of p.e.)
100.0 % (3,000 p.e.)
Individual or Appropriate Systems (IAS): 
Mainly individual sanitation systems that equipped households such as sceptic tanks or micro waste water treatment plants
0.0 % (0 p.e.)
Discharged without treatment: 
Rate of generated load of agglomeration not collected through collecting systems and not addressed through IAS (% of p.e.)
0.0 % (0 p.e.)
Generated Load by collection type in population equivalent
See the data table
Compliance: 
Not Compliant
Connection compliance: 
Connection to "collecting system" or "Individual or appropriate system" as requested by Article 3 of the Urban Waste Water Treatment directive 91/271/EC
Compliant
2nd treatment compliance: 
Secondary treatment in place and performance met as requested by Article 4 and Annex I.B of the Urban Waste Water Treatment directive 91/271/EC
Not Compliant
3rd treatment compliance: 
More stringent treatment in place and performance met as requested by Article 5 and Annex I.B of the Urban Waste Water Treatment directive 91/271/EC
Not relevant
Distance to compliance:
The distance to compliance concept present the rate of waste water load that is:
  • adequately connected to a centralised urban waste water collecting system or addressed via Individual or Appropriate System (IAS)
and then when collected:
  • treated at an adequate level (secondary or more stringent treatment) as required by the directive,
  • and with the performance requirements under tables 1 or 2 of the annex I of Directive 91/271/EEC, (UWWTD).
When countries joined the EU, they have obtained a delay to implement the Directive. In such case the deadline for implementing the above (see in section characteristics) may be different, and if the above is not already implemented for the agglomeration it is identified with orange colour in the table.
Equipment Performance
Connection 0.0%
0 p.e
2nd treatment 100,0% 100,0%
3 000 p.e 3 000 p.e
3rd treatment - -
- -
Graphical network summary
Individual And Appropriate Systems: 0 p.e (0.0%)
reseau
reseau
Ponte do Reguengo
Generated load : 3,000 p.e
Collective system :
3,000 p.e
(100.0%)
reseau
reseau
Load entering from:
Ponte do Reguengo
3,000 p.e
(100.0%)
reseau
reseau
Discharge without treatment: 0 p.e (0.0%)


reseau
    Main treatment :
  • reseau : Compliant
  • reseau : Not compliant
  • reseau : No information / Not relevant
    More stringent treatment :
    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • Other : Other more stringent
  • UV : UV treatment

    Type :
  • OZONE : Ozonation
  • SAND : Sand filtration
  • MICRO : Micro Filtration
  • CHLOR : Chlorination
    Discharge point :
  • reseau : Discharge point
  • DCP(S) : Discharge point(s)
Characteristics
 39.06000000
 -8.79000000
Deadline connection compliance: 
Deadline as regards the connection to "collecting system" or "Individual or appropriate system" as requested by Article 3 of the Urban Waste Water Treatment directive 91/271/EC
12/31/2005
Deadline 2nd treatment compliance: 
Deadline as regards the secondary treatment in place and performance met as requested by Article 4 and Annex I.B of the Urban Waste Water Treatment directive 91/271/EC
12/31/2005
Deadline 3rd treatment compliance: 
Deadline as regards the more stringent treatment in place and performance met as requested by Article 5 and Annex I.B of the Urban Waste Water Treatment directive 91/271/EC
Not Relevant
Leaks registration: 
Is a registration system for leaks in place?
false
Maintenance plan: 
Is a maintenance plan (quality assurance) in place?
false
Is best technical knowledge to limit pollution applied?: 
false
Type of sewage network: 
separated/combine/separated and combine

Not provided

Waste Water Network Connexions
Linked Treatment Plant(s): 
Linked discharge points: 
Linked receiving areas: 
Site information
Year of data: 2014
Source of data: file See sourcefile

Other years :
Year of data: 2012
Source of data: file See sourcefile

Forward looking aspect
Identified reason(s) for non compliance: 
Falta de ligação do sistema coletor à ETAR.
Measure(s) foreseen to reach compliance with Article 3 (collecting systems and IAS): 
Elevação das águas residuais e construção do emissário de Ponte do Reguengo para ligação à ETAR de Valada, a qual será remodelada e ampliada.
Date or expected date for completion of preparatory measures for the collecting system or IAS (planning, design, procurement, c: 
01 January 2016
Start date or expected start date for works on the collecting systems or IAS: 
30 April 2017
Forecast investment cost for the collecting system or IAS (as in the national plan): 
3210.29
Name of EU fund planned to be used to complete the collecting system or IAS (if any): 
FC
Amount of (planned) EU funds likely to be requested to complete the collecting system or IAS (if any): 
0
Any relevant comment on collecting system or IAS: 
Candidatura POSEUR em audiência prévia, submetida em 29-05-2015 conforme comprovativo de candidatura. A calendarização física das medidas foi ajustada atendendo à previsivel data de aprovação do financiamento. Medida PTE1P01M29_SUP_RH5 do PGRH - Construção da ETAR de Valada e sistema intercetor no concelho do Cartaxo. Contencioso - pequenas aglomerações.