See diagram
Bone Sulinowo | UWWTD SIIF Poland National Node

Bone Sulinowo

Agglomeration view on a map with some info

UWWTP : Bone Sulinowo - Identifier : PLZA0410 - Status : Active - Connected - Reporting year : 2010
Region (NUTS) Code : PL42 - Region (NUTS) Name : Zachodniopomorskie

compliance Time Line
List of all the year available for the agglomeration

2010

2013

2014

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
Not available
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
6 988
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
202 000
Method used to determine the volume of waste water treated: 
M
Treatment performance: BOD5: 
Biological Oxygen Demand
Pass
Treatment performance: COD: 
Chemical Oxygen Demand
Pass
Treatment performance: TSS: 
Total Suspended Solids
Pass
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
NR
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
NR
Treatment performance: Other: 
e.g. e-coli
Compliance: 
PD
Treatment type in place: 
Secondary treatment
Treatment required: 
?
Treatment met: 
No
Performance met: 
No
In cause of failure: Bad operating/Bad design or dimensioning: 
Not available
In cause of failure: Bad design or dimensioning: 
Not available
In cause of failure: Further information on cause of failure: 
Not available
See diagram

Load and concentration per parameter :

Incoming Discharged Rate
BOD 127260 t/year 25008 t/year 80.3%
630000 mg/l 123801.98 mg/l
COD 269569 t/year 69387 t/year 74.3%
1334500 mg/l 343500 mg/l
Nitrogen 14140 t/year 9898 t/year 30%
70000 mg/l 49000 mg/l
Phosphorus 2020 t/year 1212 t/year 40%
10000 mg/l 6000 mg/l
* Concentration calculated using the annual load and the annual volume of wastewater treated.
Incoming and discharged loads (t/year)
See the data table
Graphical network summary
Network
Agglomerations : 1 Agglomeration : Borne Sulinowo
(Generated
Network
Network
Entering :
0 p.e
Network
reseau
1 DCP(S)
Discharge point: Bone Sulinowo
(A58)

    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Linked receiving area(s): 
Not available
Linked discharge point(s): 
Site information
Characteristics
 53.56000000
 20.99000000
Date of closing: 
Explanation for closing: 
ID of the successor: 

Not provided

Primary treatment: 
Not available
Secondary treatment: 
Yes
N removal: 
Not available
P removal: 
Not available
UV: 
Not available
Ozonation: 
Not available
Sand filtration: 
Not available
Chlorination: 
Not available
Micro filtration: 
Not available
Other treatment: 
Not available
Other type of more stringent treatment: 
Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
Not available
Remarks: