Malta South

Agglomeration : Malta South - Identifier : MTMS - Status : Active - Reporting year : 2014
Region (NUTS) Code : MT001 - Region (NUTS) Name : Malta

Compliance timeline

2014

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description 2014
See diagram
Generated load (p.e.): 
Load generated by the agglomeration. It Includes load generated by resident and non-resident population (e.g. tourism), industrial and tertiary sectors connected to collecting system, rain under normal climatic conditions. It integrates Individual or Appropriate systems and seasonal variation.
433 634
Connected to collecting system: 
Rate of generated load of agglomeration collected through collecting system (% of p.e.)
100.0 % (433634 p.e.)
Individual or Appropriate Systems (IAS): 
Mainly individual sanitation systems that equipped households such as sceptic tanks or micro waste water treatment plants
0.0 % (0 p.e.)
Discharged without treatment: 
Rate of generated load of agglomeration not collected through collecting systems and not addressed through IAS (% of p.e.)
0.0 % (0 p.e.)
Generated Load by collection type in population equivalent
See the data table
Compliance: 
Not Compliant
Connection compliance: 
Connection to "collecting system" or "Individual or appropriate system" as requested by Article 3 of the Urban Waste Water Treatment directive 91/271/EC
Compliant
2nd treatment compliance: 
Secondary treatment in place and performance met as requested by Article 4 and Annex I.B of the Urban Waste Water Treatment directive 91/271/EC
Not Compliant
3rd treatment compliance: 
More stringent treatment in place and performance met as requested by Article 5 and Annex I.B of the Urban Waste Water Treatment directive 91/271/EC
Not relevant
Distance to compliance:
The distance to compliance concept present the rate of waste water load that is:
  • adequately connected to a centralised urban waste water collecting system or addressed via Individual or Appropriate System (IAS)
and then when collected:
  • treated at an adequate level (secondary or more stringent treatment) as required by the directive,
  • and with the performance requirements under tables 1 or 2 of the annex I of Directive 91/271/EEC, (UWWTD).
When countries joined the EU, they have obtained a delay to implement the Directive. In such case the deadline for implementing the above (see in section characteristics) may be different, and if the above is not already implemented for the agglomeration it is identified with orange colour in the table.
Equipment Performance
Connection 0.0%
0 p.e
2nd treatment 0,0% 94,0%
0 p.e 407 616 p.e
3rd treatment 0.0% -%
0 p.e - p.e
Graphical network summary
Individual And Appropriate Systems: 0 p.e (0.0%)
reseau
reseau
Malta South
Generated load : 433634 p.e
Collective system :
433634 p.e
(100.0%)
reseaureseau
reseau
Load entering from:
Malta South
407616 p.e
(94.0%)
reseau
Load entering from:
Malta South
26018 p.e
(6.0%)
reseau
N
reseau
CHLOR
reseau
SAND
reseau
reseau
Discharge without treatment: 0 p.e (0.0%)


reseau
    Main treatment :
  • reseau : Compliant
  • reseau : Not compliant
  • reseau : No information / Not relevant
    More stringent treatment :
    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • Other : Other more stringent
  • UV : UV treatment

    Type :
  • OZONE : Ozonation
  • SAND : Sand filtration
  • MICRO : Micro Filtration
  • CHLOR : Chlorination
    Discharge point :
  • reseau : Discharge point
  • DCP(S) : Discharge point(s)
Characteristics
 35.88000000
 14.56000000
Deadline connection compliance: 
Deadline as regards the connection to "collecting system" or "Individual or appropriate system" as requested by Article 3 of the Urban Waste Water Treatment directive 91/271/EC
06/30/2004
Deadline 2nd treatment compliance: 
Deadline as regards the secondary treatment in place and performance met as requested by Article 4 and Annex I.B of the Urban Waste Water Treatment directive 91/271/EC
06/30/2004
Deadline 3rd treatment compliance: 
Deadline as regards the more stringent treatment in place and performance met as requested by Article 5 and Annex I.B of the Urban Waste Water Treatment directive 91/271/EC
06/30/2004
Leaks registration: 
Is a registration system for leaks in place?
true
Maintenance plan: 
Is a maintenance plan (quality assurance) in place?
true
Is best technical knowledge to limit pollution applied?: 
true
Type of sewage network: 
separated/combine/separated and combine
B
Waste Water Network Connexions
Linked discharge points: 
Linked receiving areas: 

Not provided

Site information
Year of data: 2014
Source of data: file See sourcefile

Other years :