Agglomeration view on a map with some info UWWTP : Ballymote Waste Water Treatment Plant - Identifier : IETP_D0094 - Status : Active - Connected - Reporting year : 2016 Region (NUTS) Code : IE041 - Region (NUTS) Name : IE041 compliance Time Line List of all the year available for the agglomeration 20142016View history Compliant Not compliant Not relevant No information ? Description Load entering UWWTP (p.e.): load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)2 688Method used to determine the load : Not availableRate of entering load transported to this UWWTP by trucks (%): Not availablePhysical Capacity (p.e.): 3 000Waste water treated (m3/y): Volume of waste water treated and partially treated in the UWWTPNot availableMethod used to determine the volume of waste water treated: Not availableTreatment performance: BOD5: Biological Oxygen DemandPassTreatment performance: COD: Chemical Oxygen DemandFailTreatment performance: TSS: Total Suspended SolidsFailTreatment performance: Total nitrogen: Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitriteNot availableTreatment performance: Total phosphorus: Sum of dissolved phosphorus and insoluble phosphorusNot availableTreatment performance: Other: e.g. e-coliNot availableCompliance: Not compliantTreatment type in place: Secondary treatmentTreatment required: Secondary treatmentTreatment met: YesPerformance met: NoIn cause of failure: Bad operating/Bad design or dimensioning: 1In cause of failure: Bad design or dimensioning: 0In cause of failure: Further information on cause of failure: Not available Graphical network summary Agglomerations : 1 Agglomeration : Ballymote (Generated Ballymote Waste Water Treatment Plant Entering :2,688 p.e 1 DCP(S)Discharge point: Ballymote Waste Water Treatment Plant(NA) Main treatment : : Compliant : Not compliant : No information / Not relevant More stringent treatment : Performance : : Pass performance : Fail performance : Not relevant Type : N : Nitrogen removal P : Phosphorus removal UV : UV treatment MICRO : Micro Filtration Type : CHLOR : Chlorination OZONE : Ozonation SAND : Sand filtration O : Other more stringent Discharge point : : Discharge point DCP(S) : Discharge point(s) Waste Water Network Connexions Linked agglomeration(s): BallymoteLinked receiving area(s): Not availableLinked discharge point(s): Ballymote Waste Water Treatment Plant Site information Year of data: 2016 Source of data: See sourcefile Other years : Year of data: 2014 Source of data: See sourcefile UWWTP national Internet hyperlink: Not available Characteristics Latitude : 54.07924000 Longitude : -8.51785000 Date of closing: Not providedExplanation for closing: Not providedID of the successor: Not providedPrimary treatment: Secondary treatment: N removal: P removal: UV: Ozonation: Sand filtration: Chlorination: Micro filtration: Other treatment: Other type of more stringent treatment: Not providedOther type of more stringent : Not providedID of E-PRTR facility: Not providedAccidents: Not availableRemarks: Not provided Forward looking aspect Identified reason(s) for non compliance: Failed COD quality standards. Operational deficiency.Measure(s) to reach the compliance needed for UWWTP: Work completed - Operational improvementsLoad entering the UWWTP at the expected date of compliance (as planned): 2688Organic design capacity UWWTP (as planned): 3500Type of treatment UWWTP (as planned): 3PDate or expected date of completion of preparatory measures (planning, design, etc): 01 March 2016Date or expected start date for works: 02 March 2016Date or expected date of completion of works: 31 March 2016Expected date of compliance (12 months of compliant samples) : 31 March 2017Forecast cost investment needed for the UWWTP (as in the national plan): 0.00Any relevant comment on UWWTP: Met the mandatory effluent quality standards in the previous reporting exercise (2014) but did not meet the standards in 2016 due to Operations & Maintenance issue which has been rectified, with replacement of sludge pump. Compliant with effluent quality standards in 2017. Errors: Not provided