Shannon Town Waste Water Treatment Plant

Agglomeration view on a map with some info

UWWTP : Shannon Town Waste Water Treatment Plant - Identifier : IETP_D0045 - Status : Active - Connected - Reporting year : 2016
Region (NUTS) Code : IE051 - Region (NUTS) Name : IE051

compliance Time Line
List of all the year available for the agglomeration

2014

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
17 583
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
12 500
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
Not available
Method used to determine the volume of waste water treated: 
Not available
Treatment performance: BOD5: 
Biological Oxygen Demand
Fail
Treatment performance: COD: 
Chemical Oxygen Demand
Fail
Treatment performance: TSS: 
Total Suspended Solids
Fail
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
Not available
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
Not available
Treatment performance: Other: 
e.g. e-coli
Not available
Compliance: 
Not compliant
Treatment type in place: 
Secondary treatment
Treatment required: 
Secondary treatment
Treatment met: 
Yes
Performance met: 
No
In cause of failure: Bad operating/Bad design or dimensioning: 
1
In cause of failure: Bad design or dimensioning: 
1
In cause of failure: Further information on cause of failure: 
Not available
Graphical network summary
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Linked receiving area(s): 
Not available
Linked discharge point(s): 
Site information
Characteristics
 52.68931000
 -8.83566000
Date of closing: 

Not provided

Explanation for closing: 

Not provided

ID of the successor: 

Not provided

Primary treatment: 
Yes
Secondary treatment: 
Yes
N removal: 
No
P removal: 
No
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
No
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
Not available
Remarks: 

Not provided

Forward looking aspect
Identified reason(s) for non compliance: 
Failed BOD and COD quality standards Absence of adequate secondary treatment.
Measure(s) to reach the compliance needed for UWWTP: 
works ongoing - WWTP upgrade. Further works - Detailed design
Load entering the UWWTP at the expected date of compliance (as planned): 
23443
Organic design capacity UWWTP (as planned): 
26000
Type of treatment UWWTP (as planned): 
2
Date or expected date of completion of preparatory measures (planning, design, etc): 
30 October 2014
Date or expected start date for works: 
19 August 2015
Date or expected date of completion of works: 
01 July 2020
Expected date of compliance (12 months of compliant samples) : 
01 July 2021
Forecast cost investment needed for the UWWTP (as in the national plan): 
8.61
Any relevant comment on UWWTP: 
Phase 1 Advance Works completed - Upgraded Inlet Works. Flow and Load surveys completed. Phase 2 Detailed Design for upgrade of WWTP ongoing to meet Article 4 compliance.