Enniscorthy Waste Water Treatment Plant

Agglomeration view on a map with some info

UWWTP : Enniscorthy Waste Water Treatment Plant - Identifier : IETP_D0029 - Status : Active - Connected - Reporting year : 2016
Region (NUTS) Code : IE052 - Region (NUTS) Name : IE052

compliance Time Line
List of all the year available for the agglomeration

2014

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
14 544
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
16 000
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
Not available
Method used to determine the volume of waste water treated: 
Not available
Treatment performance: BOD5: 
Biological Oxygen Demand
Fail
Treatment performance: COD: 
Chemical Oxygen Demand
Fail
Treatment performance: TSS: 
Total Suspended Solids
Fail
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
Not available
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
Fail
Treatment performance: Other: 
e.g. e-coli
Not available
Compliance: 
Not compliant
Treatment type in place: 
Secondary treatment
Treatment required: 
More stringent treatment : Phosphorus
Treatment met: 
No
Performance met: 
No
In cause of failure: Bad operating/Bad design or dimensioning: 
1
In cause of failure: Bad design or dimensioning: 
0
In cause of failure: Further information on cause of failure: 
Not available
Graphical network summary
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Linked receiving area(s): 
Linked discharge point(s): 
Site information
Characteristics
 52.48904000
 -6.57111000
Date of closing: 

Not provided

Explanation for closing: 

Not provided

ID of the successor: 

Not provided

Primary treatment: 
Yes
Secondary treatment: 
Yes
N removal: 
No
P removal: 
No
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
No
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
Not available
Remarks: 
Primary discharge accounts for 97% of the agglomeration pe which passed for BOD/COD/TSS & TP. However, secondary discharge failed for BOD/COD/TSS & TP. This discharge accounts for 3% of total pe in the agglomeration. Therefore, it is considered that this agglomeration failed for requirements of Article 4 and 5.
Forward looking aspect
Identified reason(s) for non compliance: 
Absence of more stringent treatment for P removal. Secondary discharge failed BOD and COD quality standards due to absence of adequate treatment.
Measure(s) to reach the compliance needed for UWWTP: 
Works ongoing - WWTP upgrade - Extension of collecting system to transfer flows from Kilagoley (secondary discharge) to Enniscorthy (primary discharge) WWTP.
Load entering the UWWTP at the expected date of compliance (as planned): 
15823
Organic design capacity UWWTP (as planned): 
26200
Type of treatment UWWTP (as planned): 
3P
Date or expected date of completion of preparatory measures (planning, design, etc): 
01 December 2016
Date or expected start date for works: 
10 April 2017
Date or expected date of completion of works: 
30 June 2019
Expected date of compliance (12 months of compliant samples) : 
30 June 2020
Forecast cost investment needed for the UWWTP (as in the national plan): 
15.94
Any relevant comment on UWWTP: 
Requirements for P removal confirmed as part of Sensitive Areas review under Article 5(6) of the Directive.