AGHIA VARVARA

Agglomeration view on a map with some info

UWWTP : AGHIA VARVARA - Identifier : EL4310020120 - Status : Inactive - Not connected - Reporting year : 2018
Region (NUTS) Code : EL431 - Region (NUTS) Name : Ηράκλειο (Irakleio)

compliance Time Line
List of all the year available for the agglomeration

2018

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
3 800
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
Not available
Method used to determine the volume of waste water treated: 
Not available
Treatment performance: BOD5: 
Biological Oxygen Demand
NA
Treatment performance: COD: 
Chemical Oxygen Demand
NA
Treatment performance: TSS: 
Total Suspended Solids
NA
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
NR
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
NR
Treatment performance: Other: 
e.g. e-coli
NR
Compliance: 
Not relevant
Treatment type in place: 
Secondary treatment
Treatment required: 
Treatment met: 
Not Calculable
Performance met: 
Not Calculable
In cause of failure: Bad operating/Bad design or dimensioning: 
0
In cause of failure: Bad design or dimensioning: 
0
In cause of failure: Further information on cause of failure: 
The construction of the UWWTP has been completed and in the next period will be operational.
Graphical network summary
Network
Agglomerations : 1 Agglomeration : AGHIA VARVARA
(Generated
Network
Network
Entering :
0 p.e
Network
reseau
1 DCP(S)
Discharge point: AGHIA VARVARA
(NA)

    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Linked receiving area(s): 
Not available
Linked discharge point(s): 
Site information
Characteristics
 35.11761800
 25.00419100
Date of closing: 

Not provided

Explanation for closing: 

Not provided

ID of the successor: 

Not provided

Primary treatment: 
Yes
Secondary treatment: 
Yes
N removal: 
No
P removal: 
No
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
No
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
No
Remarks: 

Not provided

Forward looking aspect
Identified reason(s) for non compliance: 
The construction of the UWWTP has been completed and in the next period will be operational
Measure(s) to reach the compliance needed for UWWTP: 
From 2020 the UWWTP wil be operational.
Load entering the UWWTP at the expected date of compliance (as planned): 
2013
Organic design capacity UWWTP (as planned): 
3800
Type of treatment UWWTP (as planned): 
2
Date or expected date of completion of preparatory measures (planning, design, etc): 
31 December 2016
Date or expected start date for works: 
31 December 2018
Date or expected date of completion of works: 
31 December 2020
Expected date of compliance (12 months of compliant samples) : 
31 December 2021
Forecast cost investment needed for the UWWTP (as in the national plan): 
0.00