Agglomeration view on a map with some info UWWTP : PYTHAGORIO - Identifier : EL4120060110 - Status : Active - Connected - Reporting year : 2016 Region (NUTS) Code : EL412 - Region (NUTS) Name : Σάμος (Samos) compliance Time Line List of all the year available for the agglomeration 201220142016View history Compliant Not compliant Not relevant No information ? Description Load entering UWWTP (p.e.): load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)5 970Method used to determine the load : Not availableRate of entering load transported to this UWWTP by trucks (%): Not availablePhysical Capacity (p.e.): 8 000Waste water treated (m3/y): Volume of waste water treated and partially treated in the UWWTPNot availableMethod used to determine the volume of waste water treated: Not availableTreatment performance: BOD5: Biological Oxygen DemandFailTreatment performance: COD: Chemical Oxygen DemandFailTreatment performance: TSS: Total Suspended SolidsFailTreatment performance: Total nitrogen: Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitriteNRTreatment performance: Total phosphorus: Sum of dissolved phosphorus and insoluble phosphorusNRTreatment performance: Other: e.g. e-coliNRCompliance: Not relevantTreatment type in place: More stringent treatmentTreatment required: AppropriateTreatment met: Not CalculablePerformance met: Not CalculableIn cause of failure: Bad operating/Bad design or dimensioning: 0In cause of failure: Bad design or dimensioning: 0In cause of failure: Further information on cause of failure: Not available Graphical network summary Agglomerations : 1 Agglomeration : PYTHAGORIO (Generated PYTHAGORIO Entering :5,970 p.e NOZONE 1 DCP(S)Discharge point: AEGEAN SEA(NA) Main treatment : : Compliant : Not compliant : No information / Not relevant More stringent treatment : Performance : : Pass performance : Fail performance : Not relevant Type : N : Nitrogen removal P : Phosphorus removal UV : UV treatment MICRO : Micro Filtration Type : CHLOR : Chlorination OZONE : Ozonation SAND : Sand filtration O : Other more stringent Discharge point : : Discharge point DCP(S) : Discharge point(s) Waste Water Network Connexions Linked agglomeration(s): PYTHAGORIOLinked receiving area(s): Not availableLinked discharge point(s): AEGEAN SEA Site information Year of data: 2016 Source of data: See sourcefile Other years : UWWTP national Internet hyperlink: Not available Characteristics Latitude : 37.68833212 Longitude : 26.95219829 Date of closing: Not providedExplanation for closing: Not providedID of the successor: Not providedPrimary treatment: Secondary treatment: N removal: P removal: UV: Ozonation: Sand filtration: Chlorination: Micro filtration: Other treatment: Other type of more stringent treatment: Not providedOther type of more stringent : Not providedID of E-PRTR facility: Not providedAccidents: Remarks: Not provided Forward looking aspect Identified reason(s) for non compliance: Lack of sufficient number of samples which meet the directive requirementsMeasure(s) to reach the compliance needed for UWWTP: Restoration of failureLoad entering the UWWTP at the expected date of compliance (as planned): 5970Organic design capacity UWWTP (as planned): 8000Type of treatment UWWTP (as planned): 2Date or expected date of completion of preparatory measures (planning, design, etc): 30 June 2016Date or expected start date for works: 30 June 2016Date or expected date of completion of works: 30 January 2017Expected date of compliance (12 months of compliant samples) : 31 December 2017Forecast cost investment needed for the UWWTP (as in the national plan): 0.05