Agglomeration view on a map with some info UWWTP : INIADES - Identifier : EL2310210119 - Status : Active - Not connected - Reporting year : 2016 Region (NUTS) Code : EL631 - Region (NUTS) Name : EL631 compliance Time Line List of all the year available for the agglomeration 201220142016View history Compliant Not compliant Not relevant No information ? Description Load entering UWWTP (p.e.): load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)Method used to determine the load : Not availableRate of entering load transported to this UWWTP by trucks (%): Not availablePhysical Capacity (p.e.): 13 000Waste water treated (m3/y): Volume of waste water treated and partially treated in the UWWTPNot availableMethod used to determine the volume of waste water treated: Not availableTreatment performance: BOD5: Biological Oxygen DemandNATreatment performance: COD: Chemical Oxygen DemandNATreatment performance: TSS: Total Suspended SolidsNATreatment performance: Total nitrogen: Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitriteNRTreatment performance: Total phosphorus: Sum of dissolved phosphorus and insoluble phosphorusNRTreatment performance: Other: e.g. e-coliNRCompliance: Not compliantTreatment type in place: More stringent treatmentTreatment required: Secondary treatmentTreatment met: YesPerformance met: NoIn cause of failure: Bad operating/Bad design or dimensioning: 0In cause of failure: Bad design or dimensioning: 0In cause of failure: Further information on cause of failure: The UWWTP is constructed but not operational yet. Graphical network summary Agglomerations : 1 Agglomeration : NEOCHORI (Generated INIADES Entering :0 p.e NP 1 DCP(S)Discharge point: ACHELOOS RIVERACHELOOS RIVER(SA) Main treatment : : Compliant : Not compliant : No information / Not relevant More stringent treatment : Performance : : Pass performance : Fail performance : Not relevant Type : N : Nitrogen removal P : Phosphorus removal UV : UV treatment MICRO : Micro Filtration Type : CHLOR : Chlorination OZONE : Ozonation SAND : Sand filtration O : Other more stringent Discharge point : : Discharge point DCP(S) : Discharge point(s) Waste Water Network Connexions Linked agglomeration(s): NEOCHORILinked receiving area(s): ACHELOOS RIVERLinked discharge point(s): ACHELOOS RIVER Site information Year of data: 2016 Source of data: See sourcefile Other years : UWWTP national Internet hyperlink: Not available Characteristics Latitude : 38.40539979 Longitude : 21.25094774 Date of closing: Not providedExplanation for closing: Not providedID of the successor: Not providedPrimary treatment: Secondary treatment: N removal: P removal: UV: Ozonation: Sand filtration: Chlorination: Micro filtration: Other treatment: Other type of more stringent treatment: Not providedOther type of more stringent : Not providedID of E-PRTR facility: Not providedAccidents: Remarks: Not provided Forward looking aspect Identified reason(s) for non compliance: Lack of sufficient number of samples which meet the directive requirementsMeasure(s) to reach the compliance needed for UWWTP: Restoration of failureLoad entering the UWWTP at the expected date of compliance (as planned): 2573Organic design capacity UWWTP (as planned): 13000Type of treatment UWWTP (as planned): 3NPDate or expected date of completion of preparatory measures (planning, design, etc): 30 June 2016Date or expected start date for works: 30 June 2016Date or expected date of completion of works: 30 January 2017Expected date of compliance (12 months of compliant samples) : 31 December 2017Forecast cost investment needed for the UWWTP (as in the national plan): 0.05