Agglomeration view on a map with some info UWWTP : IOANNINA - Identifier : EL213001013 - Status : Active - Connected - Reporting year : 2018 Region (NUTS) Code : EL543 - Region (NUTS) Name : EL543 compliance Time Line List of all the year available for the agglomeration 2012201420162018View history Compliant Not compliant Not relevant No information ? Description Load entering UWWTP (p.e.): load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)157 000Method used to determine the load : Not availableRate of entering load transported to this UWWTP by trucks (%): Not availablePhysical Capacity (p.e.): 165 000Waste water treated (m3/y): Volume of waste water treated and partially treated in the UWWTP11 440 925Method used to determine the volume of waste water treated: MTreatment performance: BOD5: Biological Oxygen DemandPassTreatment performance: COD: Chemical Oxygen DemandPassTreatment performance: TSS: Total Suspended SolidsPassTreatment performance: Total nitrogen: Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitritePassTreatment performance: Total phosphorus: Sum of dissolved phosphorus and insoluble phosphorusPassTreatment performance: Other: e.g. e-coliNRCompliance: CompliantTreatment type in place: More stringent treatmentTreatment required: Secondary treatmentTreatment met: YesPerformance met: YesIn cause of failure: Bad operating/Bad design or dimensioning: 0In cause of failure: Bad design or dimensioning: 0In cause of failure: Further information on cause of failure: Not available Load and concentration per parameter : Incoming Discharged Rate BOD 49.79 t/year 4.35 mg/l COD 208.22 t/year 18.2 mg/l Nitrogen 62.32 t/year 5.45 mg/l Phosphorus 9.02 t/year 0.79 mg/l * Concentration calculated using the annual load and the annual volume of wastewater treated. Incoming and discharged loads (t/year) Graphical network summary Agglomerations : 6 Agglomeration : ANATOLI (GeneratedAgglomeration : ELEOUSSA (GeneratedAgglomeration : IOANNINA (GeneratedAgglomeration : KATSIKAS (GeneratedAgglomeration : PEDINI (GeneratedAgglomeration : PERAMA (Generated IOANNINA Entering :157,000 p.e NPCHLOR 1 DCP(S)Discharge point: LAPSISTA CHANNEL(NA) Main treatment : : Compliant : Not compliant : No information / Not relevant More stringent treatment : Performance : : Pass performance : Fail performance : Not relevant Type : N : Nitrogen removal P : Phosphorus removal UV : UV treatment MICRO : Micro Filtration Type : CHLOR : Chlorination OZONE : Ozonation SAND : Sand filtration O : Other more stringent Discharge point : : Discharge point DCP(S) : Discharge point(s) Waste Water Network Connexions Linked agglomeration(s): ANATOLIELEOUSSAIOANNINAKATSIKASPEDINIPERAMALinked receiving area(s): Not availableLinked discharge point(s): LAPSISTA CHANNEL Site information Year of data: 2018 Source of data: See sourcefile Other years : Year of data: 2016 Source of data: See sourcefile Year of data: 2014 Source of data: See sourcefile Year of data: 2012 Source of data: See sourcefile UWWTP national Internet hyperlink: Not available Characteristics Latitude : 39.70939851 Longitude : 20.82874111 Date of closing: Not providedExplanation for closing: Not providedID of the successor: Not providedPrimary treatment: Secondary treatment: N removal: P removal: UV: Ozonation: Sand filtration: Chlorination: Micro filtration: Other treatment: Other type of more stringent treatment: Not providedOther type of more stringent : Not providedID of E-PRTR facility: Not providedAccidents: Remarks: Not provided Forward looking aspect Identified reason(s) for non compliance: The UWWTP is being upgraded to serve new agglomerationsMeasure(s) to reach the compliance needed for UWWTP: Upgrading UWWTPLoad entering the UWWTP at the expected date of compliance (as planned): 157293Organic design capacity UWWTP (as planned): 204500Type of treatment UWWTP (as planned): 3NPmDate or expected date of completion of preparatory measures (planning, design, etc): 31 December 2019Date or expected start date for works: 31 December 2021Date or expected date of completion of works: 31 December 2024Expected date of compliance (12 months of compliant samples) : 31 December 2025Forecast cost investment needed for the UWWTP (as in the national plan): 16.00Name of EU fund planned to be used UWWTP (if any): Cohesion fund (CF)Amount of (planned) EU funding needed: 13.60