Agglomeration view on a map with some info UWWTP : YANNOULI - Identifier : EL142006019 - Status : Active - Connected - Reporting year : 2018 Region (NUTS) Code : EL612 - Region (NUTS) Name : EL612 compliance Time Line List of all the year available for the agglomeration 2012201420162018View history Compliant Not compliant Not relevant No information ? Description Load entering UWWTP (p.e.): load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)7 701Method used to determine the load : Not availableRate of entering load transported to this UWWTP by trucks (%): Not availablePhysical Capacity (p.e.): 10 833Waste water treated (m3/y): Volume of waste water treated and partially treated in the UWWTPNot availableMethod used to determine the volume of waste water treated: Not availableTreatment performance: BOD5: Biological Oxygen DemandPassTreatment performance: COD: Chemical Oxygen DemandPassTreatment performance: TSS: Total Suspended SolidsPassTreatment performance: Total nitrogen: Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitriteNRTreatment performance: Total phosphorus: Sum of dissolved phosphorus and insoluble phosphorusNRTreatment performance: Other: e.g. e-coliNRCompliance: CompliantTreatment type in place: More stringent treatmentTreatment required: Secondary treatmentTreatment met: YesPerformance met: YesIn cause of failure: Bad operating/Bad design or dimensioning: 0In cause of failure: Bad design or dimensioning: 0In cause of failure: Further information on cause of failure: Not available Graphical network summary Agglomerations : 1 Agglomeration : YANNOULI (Generated YANNOULI Entering :7,701 p.e NCHLOR 1 DCP(S)Discharge point: PINIOS RIVER(NA) Main treatment : : Compliant : Not compliant : No information / Not relevant More stringent treatment : Performance : : Pass performance : Fail performance : Not relevant Type : N : Nitrogen removal P : Phosphorus removal UV : UV treatment MICRO : Micro Filtration Type : CHLOR : Chlorination OZONE : Ozonation SAND : Sand filtration O : Other more stringent Discharge point : : Discharge point DCP(S) : Discharge point(s) Waste Water Network Connexions Linked agglomeration(s): YANNOULILinked receiving area(s): Not availableLinked discharge point(s): PINIOS RIVER Site information Year of data: 2018 Source of data: See sourcefile Other years : Year of data: 2016 Source of data: See sourcefile Year of data: 2014 Source of data: See sourcefile Year of data: 2012 Source of data: See sourcefile UWWTP national Internet hyperlink: Not available Characteristics Latitude : 39.66934002 Longitude : 22.42574124 Date of closing: Not providedExplanation for closing: Not providedID of the successor: Not providedPrimary treatment: Secondary treatment: N removal: P removal: UV: Ozonation: Sand filtration: Chlorination: Micro filtration: Other treatment: Other type of more stringent treatment: Not providedOther type of more stringent : Not providedID of E-PRTR facility: Not providedAccidents: Remarks: Not provided Forward looking aspect Identified reason(s) for non compliance: The UWWTP is being upgraded to serve new agglomerationsMeasure(s) to reach the compliance needed for UWWTP: Upgrading UWWTPLoad entering the UWWTP at the expected date of compliance (as planned): 11630Organic design capacity UWWTP (as planned): 15100Type of treatment UWWTP (as planned): 3NmDate or expected date of completion of preparatory measures (planning, design, etc): 31 December 2016Date or expected start date for works: 31 December 2020Date or expected date of completion of works: 31 December 2022Expected date of compliance (12 months of compliant samples) : 31 December 2023Forecast cost investment needed for the UWWTP (as in the national plan): 1.69Name of EU fund planned to be used UWWTP (if any): Cohesion fund (CF)Amount of (planned) EU funding needed: 1.44