Agglomeration view on a map with some info UWWTP : NEA ZICHNI - Identifier : EL1260120130 - Status : Active - Not connected - Reporting year : 2018 Region (NUTS) Code : EL526 - Region (NUTS) Name : EL526 compliance Time Line List of all the year available for the agglomeration 2012201420162018View history Compliant Not compliant Not relevant No information ? Description Load entering UWWTP (p.e.): load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)Method used to determine the load : Not availableRate of entering load transported to this UWWTP by trucks (%): Not availablePhysical Capacity (p.e.): 2 805Waste water treated (m3/y): Volume of waste water treated and partially treated in the UWWTPNot availableMethod used to determine the volume of waste water treated: Not availableTreatment performance: BOD5: Biological Oxygen DemandNATreatment performance: COD: Chemical Oxygen DemandNATreatment performance: TSS: Total Suspended SolidsNATreatment performance: Total nitrogen: Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitriteNRTreatment performance: Total phosphorus: Sum of dissolved phosphorus and insoluble phosphorusNRTreatment performance: Other: e.g. e-coliNRCompliance: Not relevantTreatment type in place: More stringent treatmentTreatment required: Secondary treatmentTreatment met: NoPerformance met: NoIn cause of failure: Bad operating/Bad design or dimensioning: 0In cause of failure: Bad design or dimensioning: 0In cause of failure: Further information on cause of failure: The UWWTP is temporary inactive. It is estimated the the UWWTP will be operational by the end of 2023. Graphical network summary Agglomerations : 1 Agglomeration : NEA ZICHNI (Generated NEA ZICHNI Entering :0 p.e NCHLOR 1 DCP(S)Discharge point: STREAM(NA) Main treatment : : Compliant : Not compliant : No information / Not relevant More stringent treatment : Performance : : Pass performance : Fail performance : Not relevant Type : N : Nitrogen removal P : Phosphorus removal UV : UV treatment MICRO : Micro Filtration Type : CHLOR : Chlorination OZONE : Ozonation SAND : Sand filtration O : Other more stringent Discharge point : : Discharge point DCP(S) : Discharge point(s) Waste Water Network Connexions Linked agglomeration(s): NEA ZICHNILinked receiving area(s): Not availableLinked discharge point(s): STREAM Site information Year of data: 2018 Source of data: See sourcefile Other years : Year of data: 2016 Source of data: See sourcefile Year of data: 2014 Source of data: See sourcefile Year of data: 2012 Source of data: See sourcefile UWWTP national Internet hyperlink: Not available Characteristics Latitude : 41.02048062 Longitude : 23.81840035 Date of closing: Not providedExplanation for closing: Not providedID of the successor: Not providedPrimary treatment: Secondary treatment: N removal: P removal: UV: Ozonation: Sand filtration: Chlorination: Micro filtration: Other treatment: Other type of more stringent treatment: Not providedOther type of more stringent : Not providedID of E-PRTR facility: Not providedAccidents: Remarks: Not provided Forward looking aspect Identified reason(s) for non compliance: The UWWTP is temporary inactive.Measure(s) to reach the compliance needed for UWWTP: Restoration of the UWWTP.Load entering the UWWTP at the expected date of compliance (as planned): 2500Organic design capacity UWWTP (as planned): 2805Type of treatment UWWTP (as planned): 3NmDate or expected date of completion of preparatory measures (planning, design, etc): 31 December 2022Date or expected start date for works: 31 December 2023Date or expected date of completion of works: 31 December 2026Expected date of compliance (12 months of compliant samples) : 31 December 2027Forecast cost investment needed for the UWWTP (as in the national plan): 2.24