Agglomeration view on a map with some info UWWTP : FILLIPI - Identifier : EL1150100118 - Status : Active - Connected - Reporting year : 2016 Region (NUTS) Code : EL515 - Region (NUTS) Name : EL515 compliance Time Line List of all the year available for the agglomeration 201220142016View history Compliant Not compliant Not relevant No information ? Description Load entering UWWTP (p.e.): load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)11 559Method used to determine the load : Not availableRate of entering load transported to this UWWTP by trucks (%): Not availablePhysical Capacity (p.e.): 20 000Waste water treated (m3/y): Volume of waste water treated and partially treated in the UWWTPNot availableMethod used to determine the volume of waste water treated: Not availableTreatment performance: BOD5: Biological Oxygen DemandFailTreatment performance: COD: Chemical Oxygen DemandFailTreatment performance: TSS: Total Suspended SolidsFailTreatment performance: Total nitrogen: Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitriteNRTreatment performance: Total phosphorus: Sum of dissolved phosphorus and insoluble phosphorusNRTreatment performance: Other: e.g. e-coliNRCompliance: Not compliantTreatment type in place: More stringent treatmentTreatment required: Secondary treatmentTreatment met: YesPerformance met: NoIn cause of failure: Bad operating/Bad design or dimensioning: 0In cause of failure: Bad design or dimensioning: 0In cause of failure: Further information on cause of failure: Not available Graphical network summary Agglomerations : 1 Agglomeration : KRINIDES (Generated FILLIPI Entering :11,559 p.e NPCHLOR 1 DCP(S)Discharge point: DATOU PHILIPPON CHANNEL(NA) Main treatment : : Compliant : Not compliant : No information / Not relevant More stringent treatment : Performance : : Pass performance : Fail performance : Not relevant Type : N : Nitrogen removal P : Phosphorus removal UV : UV treatment MICRO : Micro Filtration Type : CHLOR : Chlorination OZONE : Ozonation SAND : Sand filtration O : Other more stringent Discharge point : : Discharge point DCP(S) : Discharge point(s) Waste Water Network Connexions Linked agglomeration(s): KRINIDESLinked receiving area(s): Not availableLinked discharge point(s): DATOU PHILIPPON CHANNEL Site information Year of data: 2016 Source of data: See sourcefile Other years : UWWTP national Internet hyperlink: Not available Characteristics Latitude : 40.95956554 Longitude : 24.32571169 Date of closing: Not providedExplanation for closing: Not providedID of the successor: Not providedPrimary treatment: Secondary treatment: N removal: P removal: UV: Ozonation: Sand filtration: Chlorination: Micro filtration: Other treatment: Other type of more stringent treatment: Not providedOther type of more stringent : Not providedID of E-PRTR facility: Not providedAccidents: Remarks: Not provided Forward looking aspect Identified reason(s) for non compliance: Lack of sufficient number of samples which meet the directive requirementsMeasure(s) to reach the compliance needed for UWWTP: Restoration of failureLoad entering the UWWTP at the expected date of compliance (as planned): 11559Organic design capacity UWWTP (as planned): 20000Type of treatment UWWTP (as planned): 3NPmDate or expected date of completion of preparatory measures (planning, design, etc): 01 January 2017Date or expected start date for works: 01 January 2017Date or expected date of completion of works: 31 December 2018Expected date of compliance (12 months of compliant samples) : 31 December 2018Forecast cost investment needed for the UWWTP (as in the national plan): 0.05