Agglomeration view on a map with some info UWWTP : ECHINOS - Identifier : EL1120040219 - Status : Active - Connected - Reporting year : 2018 Region (NUTS) Code : EL512 - Region (NUTS) Name : EL512 compliance Time Line List of all the year available for the agglomeration 2018View history Compliant Not compliant Not relevant No information ? Description Load entering UWWTP (p.e.): load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)2 197Method used to determine the load : Not availableRate of entering load transported to this UWWTP by trucks (%): Not availablePhysical Capacity (p.e.): 2 800Waste water treated (m3/y): Volume of waste water treated and partially treated in the UWWTPNot availableMethod used to determine the volume of waste water treated: Not availableTreatment performance: BOD5: Biological Oxygen DemandFailTreatment performance: COD: Chemical Oxygen DemandFailTreatment performance: TSS: Total Suspended SolidsFailTreatment performance: Total nitrogen: Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitriteNRTreatment performance: Total phosphorus: Sum of dissolved phosphorus and insoluble phosphorusNRTreatment performance: Other: e.g. e-coliNRCompliance: Not compliantTreatment type in place: More stringent treatmentTreatment required: Secondary treatmentTreatment met: YesPerformance met: NoIn cause of failure: Bad operating/Bad design or dimensioning: 0In cause of failure: Bad design or dimensioning: 0In cause of failure: Further information on cause of failure: There are adequate monitoring data for the year 2018, but the monitoring data of 2019 are in compliance. Graphical network summary Agglomerations : 1 Agglomeration : ECHINOS (Generated ECHINOS Entering :2,197 p.e NPCHLORO 1 DCP(S)Discharge point: ECHINOS(NA) Main treatment : : Compliant : Not compliant : No information / Not relevant More stringent treatment : Performance : : Pass performance : Fail performance : Not relevant Type : N : Nitrogen removal P : Phosphorus removal UV : UV treatment MICRO : Micro Filtration Type : CHLOR : Chlorination OZONE : Ozonation SAND : Sand filtration O : Other more stringent Discharge point : : Discharge point DCP(S) : Discharge point(s) Waste Water Network Connexions Linked agglomeration(s): ECHINOSLinked receiving area(s): Not availableLinked discharge point(s): ECHINOS Site information Year of data: 2018 Source of data: See sourcefile Other years : UWWTP national Internet hyperlink: Not available Characteristics Latitude : 41.27540000 Longitude : 24.97240000 Date of closing: Not providedExplanation for closing: Not providedID of the successor: Not providedPrimary treatment: Secondary treatment: N removal: P removal: UV: Ozonation: Sand filtration: Chlorination: Micro filtration: Other treatment: Other type of more stringent treatment: Not providedOther type of more stringent : Not providedID of E-PRTR facility: Not providedAccidents: Remarks: Not provided Forward looking aspect Identified reason(s) for non compliance: Fail to meet the Directives' effluent standards.Measure(s) to reach the compliance needed for UWWTP: Improvement of the operation of the UWWTPLoad entering the UWWTP at the expected date of compliance (as planned): 2197Organic design capacity UWWTP (as planned): 2800Type of treatment UWWTP (as planned): 3NPmDate or expected date of completion of preparatory measures (planning, design, etc): 31 December 2016Date or expected start date for works: 31 December 2017Date or expected date of completion of works: 31 December 2018Expected date of compliance (12 months of compliant samples) : 31 December 2019Forecast cost investment needed for the UWWTP (as in the national plan): 0.00