Summary chapter

×

Error message

There are probably an error in sludge destination (delta = 1396360 t DS/y)

Summary chapter for national stats

Select the year to generate the graphs.

2018

Germany has 99.8% of its generated load compliant to the Urban Waste Water Treatment Directive (91/271/EEC).

In 2018, Germany counted 3913 agglomerations generating ≥2,000 p.e. each, of which:

  • 3896 agglomerations, generating 111,007,660 p.e. of waste water, complied with the requirements of the Directive; and
  • 9 agglomerations, generating 122,911 p.e. of waste water, did not comply with the requirements of the Directive.

The waste water load generated in Germany in 2018 was reported to be 111,254,546 p.e.

In 2018, Germany had not yet reached the target for treating waste water to fully comply with the Directive.

  • All the waste water load is connected to collecting system or to Individual and Appropriate Systems; and
  • 0.1% of the collected waste water load must still undergo secondary treatment in line with the requirements of the Directive (approximately 122,000 p.e.),
  • 0.1% of the collected waste water load from agglomerations generating >10,000 p.e. and discharging into sensitive areas must still undergo more stringent treatment in line with the requirements of the Directive (approximately 105,200 p.e.).

1.6% of waste water load is addressed by means of individual or other appropriate systems (IAS) i.e. non-centralised sanitation systems (approximately 1,822,300 p.e.).

For the 3913 agglomerations, there are 3796 urban waste water treatment plants, with a total design capacity of 147,064,000 p.e., of which:

  • There is no plant active but not connected to collecting system,
  • 230 plants equipped with technology only for primary and secondary treatment,
  • 3566 plants equipped with technology for more stringent treatment than secondary.

Based on the 2018 data, it seems that the load generated is lower than the design capacity.

Compliance rate by Article

Agglomeration Waste water load
Germany in 2018 Total
[No]
Comply
[No]
Comply
[%]
Total
[p.e.]
Comply
[p.e.]
Comply
[%]
Article 3 (collection) 3913 3913 100 % 111,254,546 111,254,546 100 %
Article 4 (secondary treatment) 3884* 3875 99.8 % 109,217,622** 109,095,473 99.9 %
Article 5 (more stringent treatment) 1865* 1861 99.8 % 99,707,871** 99,602,984 99.9 %

Notice : This table contains only agglomerations with expired deadlines.

*The total [No of agglomerations] includes only those agglomerations that must provide secondary treatment / or more stringent treatment than secondary before discharging waste water from their treatment plants.

**The total [p.e. waste water load] is the sum of the load of all of the agglomerations that must provide secondary treatment or more stringent treatment than secondary before discharging waste water from their treatment plants.

Data source for table: Register, summary of MS data

29 agglomerations were not taken into account in calculations of the compliance rate for Article 4 because the agglomerations use IAS for more than 98% of the collected load.

2048 agglomerations were not taken into account in the calculation of the compliance rate for Article 5 because these agglomerations generate ≤10,000 p.e. each.

Distance to target

Waste water load
Germany in 2018 Target
[p.e.]
Distance to target
[p.e.]
Distance to target
[%]
Collection 111,252,775 0 0 %
Secondary treatment* 109,217,621 122,011 0.1 %
More stringent treatment** 99,707,871 105,181 0.1 %

*The target [p.e.] for secondary treatment represents the waste water load (collected and not collected) from all agglomerations that must be subject to secondary treatment, regardless of whether or not the agglomeration complies with Article 3.

** The target for more stringent treatment represents the waste water load (collected and not collected) from all agglomerations generating >10,000 p.e. and discharging into sensitive areas (regardless of whether or not the agglomeration complies with Article 3).

Data source for table: Register, summary of MS data

The expected annual investment costs per capita for installing and renewing waste water collecting systems and treatment plants is nan EUR/inhabitant/year.

The investment needs for ensuring adequate urban waste water collection and treatment, i.e. compliance with the Directive, as estimated by the national authorities and included in their national plan, are at the level of EUR 0 million for the period 2020-2020. This covers works on treatment plants, with the forecasted investment cost of EUR 0 million (2020-2020) , and works on collecting systems and/or IAS, with a forecasted investment cost of EUR 0 million (2020-2020).However, as indicated in a recent OECD study, Germany would need to increase their investments further to reach and maintain compliance. The OECD projected that the financing needs by 2030 (total cumulative additional expenditures for sanitation) is EUR 36.4 billion.

For the reference year 2018, Germany reported the production of 1,396,360 tonnes of sludge. The sludge is mainly missing for (100 %).

At 10 discharge points, treated waste water is reused for infiltration.

No information was reported on storm water overflows by Germany.