TP (1300000055) of akaslompolo

Agglomeration view on a map with some info

UWWTP : TP (1300000055) of akaslompolo - Identifier : FIJVP_O001300000055 - Status : Active - Connected - Reporting year : 2016
Region (NUTS) Code : FI1D7 - Region (NUTS) Name : Lappi

compliance Time Line
List of all the year available for the agglomeration

2012

2014

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
10 500
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
8 000
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
Not available
Method used to determine the volume of waste water treated: 
Not available
Treatment performance: BOD5: 
Biological Oxygen Demand
Fail
Treatment performance: COD: 
Chemical Oxygen Demand
Fail
Treatment performance: TSS: 
Total Suspended Solids
Fail
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
NR
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
Pass
Treatment performance: Other: 
e.g. e-coli
NR
Compliance: 
Not compliant
Treatment type in place: 
More stringent treatment
Treatment required: 
More stringent treatment : Phosphorus
Treatment met: 
Yes
Performance met: 
No
In cause of failure: Bad operating/Bad design or dimensioning: 
0
In cause of failure: Bad design or dimensioning: 
0
In cause of failure: Further information on cause of failure: 
Not available
Graphical network summary
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Linked receiving area(s): 
Site information
Characteristics
 67.51013000
 24.00079000
Date of closing: 
Explanation for closing: 
ID of the successor: 

Not provided

Primary treatment: 
Yes
Secondary treatment: 
Yes
N removal: 
No
P removal: 
Yes
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
No
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 
N
Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
No
Remarks: 
The share of tourism in the load to this UWWTP is large compared to the number of permanent inhabitants of the agglomeration served.
Forward looking aspect
Identified reason(s) for non compliance: 
Insufficient BOD, COD and TSS removal / Absence of tertiary treatment
Measure(s) to reach the compliance needed for UWWTP: 
Building a new treatment plant. Implementation of a new plant has delayed, but the detailed design of a new plant has started.
Load entering the UWWTP at the expected date of compliance (as planned): 
10500
Organic design capacity UWWTP (as planned): 
8000
Type of treatment UWWTP (as planned): 
3NP
Date or expected date of completion of preparatory measures (planning, design, etc): 
01 January 2015
Date or expected start date for works: 
01 January 2019
Date or expected date of completion of works: 
31 December 2021
Expected date of compliance (12 months of compliant samples) : 
31 December 2022
Forecast cost investment needed for the UWWTP (as in the national plan): 
20000000.00