Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
Not available
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
Not available
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
Not available
Method used to determine the volume of waste water treated: 
Not available
Treatment performance: BOD5: 
Biological Oxygen Demand
Not available
Treatment performance: COD: 
Chemical Oxygen Demand
Not available
Treatment performance: TSS: 
Total Suspended Solids
Not available
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
Not available
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
Not available
Treatment performance: Other: 
e.g. e-coli
Not available
Compliance: 
PD
Treatment type in place: 
No information
Treatment required: 
Treatment met: 
Not Calculable
Performance met: 
Not Calculable
In cause of failure: Bad operating/Bad design or dimensioning: 
0
In cause of failure: Bad design or dimensioning: 
0
In cause of failure: Further information on cause of failure: 
Not available
Graphical network summary
Network
Network
Entering :
0 p.e
Network
reseau
0 DCP(S)
Discharge point:
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Not available
Linked receiving area(s): 
Not available
Linked discharge point(s): 
Not available
Site information
Characteristics
 35.13000000
 33.01000000
Date of closing: 

Not provided

Explanation for closing: 
not yet operational
ID of the successor: 

Not provided

Primary treatment: 
No
Secondary treatment: 
No
N removal: 
No
P removal: 
No
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
No
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 
0
ID of E-PRTR facility: 

Not provided

Accidents: 
No
Remarks: 

Not provided

Forward looking aspect
Identified reason(s) for non compliance: 
Absence of UWWTP
Measure(s) to reach the compliance needed for UWWTP: 
Building of a treatment plant
Load entering the UWWTP at the expected date of compliance (as planned): 
7700
Organic design capacity UWWTP (as planned): 
10550
Type of treatment UWWTP (as planned): 
3m
Date or expected date of completion of preparatory measures (planning, design, etc): 
07 September 2012
Date or expected start date for works: 
24 September 2012
Date or expected date of completion of works: 
08 July 2015
Expected date of compliance (12 months of compliant samples) : 
31 December 2017
Forecast cost investment needed for the UWWTP (as in the national plan): 
10.00
Name of EU fund planned to be used UWWTP (if any): 
CF
Amount of (planned) EU funding needed: 
8.00
Any relevant comment on UWWTP: 
Implementation Delays due to tendering procedures