Agglomeration view on a map with some info UWWTP : Astromeritis - Identifier : CY102_UWWTP - Status : Inactive - Not connected - Reporting year : 2014 compliance Time Line List of all the year available for the agglomeration 201420162018View history Compliant Not compliant Not relevant No information ? Description Load entering UWWTP (p.e.): load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)Not availableMethod used to determine the load : Not availableRate of entering load transported to this UWWTP by trucks (%): Not availablePhysical Capacity (p.e.): Not availableWaste water treated (m3/y): Volume of waste water treated and partially treated in the UWWTPNot availableMethod used to determine the volume of waste water treated: Not availableTreatment performance: BOD5: Biological Oxygen DemandNot availableTreatment performance: COD: Chemical Oxygen DemandNot availableTreatment performance: TSS: Total Suspended SolidsNot availableTreatment performance: Total nitrogen: Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitriteNot availableTreatment performance: Total phosphorus: Sum of dissolved phosphorus and insoluble phosphorusNot availableTreatment performance: Other: e.g. e-coliNot availableCompliance: PDTreatment type in place: No informationTreatment required: Treatment met: Not CalculablePerformance met: Not CalculableIn cause of failure: Bad operating/Bad design or dimensioning: 0In cause of failure: Bad design or dimensioning: 0In cause of failure: Further information on cause of failure: Not available Graphical network summary Agglomerations : 0 Astromeritis Entering :0 p.e 0 DCP(S)Discharge point: Main treatment : : Compliant : Not compliant : No information / Not relevant More stringent treatment : Performance : : Pass performance : Fail performance : Not relevant Type : N : Nitrogen removal P : Phosphorus removal UV : UV treatment MICRO : Micro Filtration Type : CHLOR : Chlorination OZONE : Ozonation SAND : Sand filtration O : Other more stringent Discharge point : : Discharge point DCP(S) : Discharge point(s) Waste Water Network Connexions Linked agglomeration(s): Not availableLinked receiving area(s): Not availableLinked discharge point(s): Not available Site information Year of data: 2014 Source of data: See sourcefile Other years : Year of data: 2018 Source of data: See sourcefile Year of data: 2016 Source of data: See sourcefile UWWTP national Internet hyperlink: Not available Characteristics Latitude : 35.13000000 Longitude : 33.01000000 Date of closing: Not providedExplanation for closing: not yet operationalID of the successor: Not providedPrimary treatment: Secondary treatment: N removal: P removal: UV: Ozonation: Sand filtration: Chlorination: Micro filtration: Other treatment: Other type of more stringent treatment: Not providedOther type of more stringent : 0ID of E-PRTR facility: Not providedAccidents: Remarks: Not provided Forward looking aspect Identified reason(s) for non compliance: Absence of UWWTPMeasure(s) to reach the compliance needed for UWWTP: Building of a treatment plantLoad entering the UWWTP at the expected date of compliance (as planned): 7700Organic design capacity UWWTP (as planned): 10550Type of treatment UWWTP (as planned): 3mDate or expected date of completion of preparatory measures (planning, design, etc): 07 September 2012Date or expected start date for works: 24 September 2012Date or expected date of completion of works: 08 July 2015Expected date of compliance (12 months of compliant samples) : 31 December 2017Forecast cost investment needed for the UWWTP (as in the national plan): 10.00Name of EU fund planned to be used UWWTP (if any): CFAmount of (planned) EU funding needed: 8.00Any relevant comment on UWWTP: Implementation Delays due to tendering procedures Errors: Not provided