Čazma

Agglomeration view on a map with some info

UWWTP : Čazma - Identifier : HRUWWTP_0006011_001 - Status : Active - Not connected - Reporting year : 2014

compliance Time Line
List of all the year available for the agglomeration

2014

2016

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
Not available
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
Not available
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
Not available
Method used to determine the volume of waste water treated: 
Not available
Treatment performance: BOD5: 
Biological Oxygen Demand
Not available
Treatment performance: COD: 
Chemical Oxygen Demand
Not available
Treatment performance: TSS: 
Total Suspended Solids
Not available
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
Not available
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
Not available
Treatment performance: Other: 
e.g. e-coli
Not available
Compliance: 
PD
Treatment type in place: 
No information
Treatment required: 
NI
Treatment met: 
No
Performance met: 
No
In cause of failure: Bad operating/Bad design or dimensioning: 
0
In cause of failure: Bad design or dimensioning: 
0
In cause of failure: Further information on cause of failure: 
Not available
Graphical network summary
Network
Agglomerations : 1 Agglomeration : Čazma
(Generated
Network
Network
Entering :
0 p.e
Network
reseau
0 DCP(S)
Discharge point:
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Linked receiving area(s): 
Not available
Linked discharge point(s): 
Not available
Site information
Characteristics
 45.75000000
 16.62000000
Date of closing: 

Not provided

Explanation for closing: 

Not provided

ID of the successor: 

Not provided

Primary treatment: 
No
Secondary treatment: 
No
N removal: 
No
P removal: 
No
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
No
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
No
Remarks: 
inactive object added in order to comply to QAQC rule on art.17, non-existing uwwtp; coordinates are the same as the center of agglomeration
Forward looking aspect
Measure(s) to reach the compliance needed for UWWTP: 
building of the new WWTP, reconstruction and/or upgrade of the existing WWTP to ensure required level of treatment and capacity
Load entering the UWWTP at the expected date of compliance (as planned): 
5000
Organic design capacity UWWTP (as planned): 
5000
Type of treatment UWWTP (as planned): 
2
Date or expected date of completion of preparatory measures (planning, design, etc): 
31 December 2020
Date or expected start date for works: 
31 March 2021
Date or expected date of completion of works: 
31 December 2023
Expected date of compliance (12 months of compliant samples) : 
31 December 2024
Forecast cost investment needed for the UWWTP (as in the national plan): 
1630000.00
Name of EU fund planned to be used UWWTP (if any): 
Cohesion fund
Amount of (planned) EU funding needed: 
1059500.00