See diagram
UWWTP Dobrich | European Commission urban waste water website: Bulgaria
Beta Version : remaining inconsistencies are possible. They will be corrected during the next reporting exercise

UWWTP Dobrich

Agglomeration view on a map with some info

UWWTP : UWWTP Dobrich - Identifier : BGWT72624_00_01 - Status : Active - Connected - Reporting year : 2018
Region (NUTS) Code : BG332 - Region (NUTS) Name : Добрич (Dobrich)

compliance Time Line
List of all the year available for the agglomeration

2012

2014

2016

2018

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
Load entering UWWTP (p.e.): 
load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)
79 911
Method used to determine the load : 
Not available
Rate of entering load transported to this UWWTP by trucks (%): 
Not available
Physical Capacity (p.e.): 
112 000
Waste water treated (m3/y): 
Volume of waste water treated and partially treated in the UWWTP
4 869 048
Method used to determine the volume of waste water treated: 
M
Treatment performance: BOD5: 
Biological Oxygen Demand
Pass
Treatment performance: COD: 
Chemical Oxygen Demand
Pass
Treatment performance: TSS: 
Total Suspended Solids
Pass
Treatment performance: Total nitrogen: 
Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitrite
NR
Treatment performance: Total phosphorus: 
Sum of dissolved phosphorus and insoluble phosphorus
NR
Treatment performance: Other: 
e.g. e-coli
NR
Compliance: 
Not compliant
Treatment type in place: 
More stringent treatment
Treatment required: 
More stringent treatment : Nitrogen and Phosphorus
Treatment met: 
Yes
Performance met: 
No
In cause of failure: Bad operating/Bad design or dimensioning: 
0
In cause of failure: Bad design or dimensioning: 
0
In cause of failure: Further information on cause of failure: 
Area added to catchment of sensitive area in reporting 2018. After completion of construction works the monitoring data show "PASS" during the period of exploitation.
See diagram

Load and concentration per parameter :

Incoming Discharged Rate
BOD 0.88 t/year
0.18 mg/l
COD 320.84 t/year
65.89 mg/l
Nitrogen 52.5 t/year
10.78 mg/l
Phosphorus 4.38 t/year
0.9 mg/l
* Concentration calculated using the annual load and the annual volume of wastewater treated.
Incoming and discharged loads (t/year)
See the data table
Graphical network summary
Network
Agglomerations : 1 Agglomeration : Dobrich
(Generated
Network
Network
Entering :
79,911 p.e
Network
N
Network
P
Network
CHLOR
Network
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Performance :
  • Network : Pass performance
  • Network : Fail performance
  • Network : Not relevant

    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • UV : UV treatment
  • MICRO : Micro Filtration

    Type :
  • CHLOR : Chlorination
  • OZONE : Ozonation
  • SAND : Sand filtration
  • O : Other more stringent
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
Waste Water Network Connexions
Linked agglomeration(s): 
Linked receiving area(s): 
Linked discharge point(s): 
Site information
Characteristics
 43.63083300
 27.78138900
Date of closing: 

Not provided

Explanation for closing: 

Not provided

ID of the successor: 

Not provided

Primary treatment: 
Yes
Secondary treatment: 
Yes
N removal: 
Yes
P removal: 
Yes
UV: 
No
Ozonation: 
No
Sand filtration: 
No
Chlorination: 
Yes
Micro filtration: 
No
Other treatment: 
No
Other type of more stringent treatment: 

Not provided

Other type of more stringent : 

Not provided

ID of E-PRTR facility: 

Not provided

Accidents: 
No
Remarks: 
Construction works completed, Tertiary treatment constructer, construction workes completed at 20-11-2019
Forward looking aspect
Identified reason(s) for non compliance: 
Area added to catchment of sensitive area in reporting 2018. After completion of construction works the monitoring data show "PASS" during the period of exploitation.
Measure(s) to reach the compliance needed for UWWTP: 
collection of monitoring data
Load entering the UWWTP at the expected date of compliance (as planned): 
120000
Organic design capacity UWWTP (as planned): 
120000
Type of treatment UWWTP (as planned): 
3NP
Date or expected date of completion of preparatory measures (planning, design, etc): 
31 December 2024
Date or expected start date for works: 
31 December 2025
Date or expected date of completion of works: 
31 December 2029
Expected date of compliance (12 months of compliant samples) : 
31 December 2016
Forecast cost investment needed for the UWWTP (as in the national plan): 
44.21
Name of EU fund planned to be used UWWTP (if any): 
Cohesion fund
Amount of (planned) EU funding needed: 
37.58
Any relevant comment on UWWTP: 
Project in progress, 'phased project'