Agglomeration view on a map with some info UWWTP : UWWTP Dulovo - Identifier : BGWT24030_00_01 - Status : Active - Connected - Reporting year : 2018 Region (NUTS) Code : BG325 - Region (NUTS) Name : Силистра (Silistra) compliance Time Line List of all the year available for the agglomeration 2012201420162018View history Compliant Not compliant Not relevant No information ? Description Load entering UWWTP (p.e.): load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)1 943Method used to determine the load : Not availableRate of entering load transported to this UWWTP by trucks (%): Not availablePhysical Capacity (p.e.): 35 000Waste water treated (m3/y): Volume of waste water treated and partially treated in the UWWTP261 428Method used to determine the volume of waste water treated: MTreatment performance: BOD5: Biological Oxygen DemandFailTreatment performance: COD: Chemical Oxygen DemandFailTreatment performance: TSS: Total Suspended SolidsPassTreatment performance: Total nitrogen: Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitriteNRTreatment performance: Total phosphorus: Sum of dissolved phosphorus and insoluble phosphorusNRTreatment performance: Other: e.g. e-coliNRCompliance: Not compliantTreatment type in place: More stringent treatmentTreatment required: Secondary treatmentTreatment met: NoPerformance met: NoIn cause of failure: Bad operating/Bad design or dimensioning: 1In cause of failure: Bad design or dimensioning: 0In cause of failure: Further information on cause of failure: Old and not well-behaving facilities Graphical network summary Agglomerations : 1 Agglomeration : Dulovo (Generated UWWTP Dulovo Entering :1,943 p.e CHLOR 1 DCP(S)Discharge point: UWWTP DulovoCatchment of Danube river(CSA) Main treatment : : Compliant : Not compliant : No information / Not relevant More stringent treatment : Performance : : Pass performance : Fail performance : Not relevant Type : N : Nitrogen removal P : Phosphorus removal UV : UV treatment MICRO : Micro Filtration Type : CHLOR : Chlorination OZONE : Ozonation SAND : Sand filtration O : Other more stringent Discharge point : : Discharge point DCP(S) : Discharge point(s) Waste Water Network Connexions Linked agglomeration(s): DulovoLinked receiving area(s): Catchment of Danube riverLinked discharge point(s): UWWTP Dulovo Site information Year of data: 2018 Source of data: See sourcefile Other years : Year of data: 2016 Source of data: See sourcefile Year of data: 2014 Source of data: See sourcefile Year of data: 2012 Source of data: See sourcefile UWWTP national Internet hyperlink: Not available Characteristics Latitude : 43.83277200 Longitude : 27.13299700 Date of closing: Not providedExplanation for closing: Not providedID of the successor: Not providedPrimary treatment: Secondary treatment: N removal: P removal: UV: Ozonation: Sand filtration: Chlorination: Micro filtration: Other treatment: Other type of more stringent treatment: Not providedOther type of more stringent : Not providedID of E-PRTR facility: Not providedAccidents: Remarks: Not provided Forward looking aspect Identified reason(s) for non compliance: Old and not well-behaving facilitiesMeasure(s) to reach the compliance needed for UWWTP: reconstruction/building new WWTPLoad entering the UWWTP at the expected date of compliance (as planned): 8741Organic design capacity UWWTP (as planned): 35000Type of treatment UWWTP (as planned): 2Date or expected date of completion of preparatory measures (planning, design, etc): 31 December 2024Date or expected start date for works: 31 December 2025Date or expected date of completion of works: 31 December 2029Expected date of compliance (12 months of compliant samples) : 31 December 2030Forecast cost investment needed for the UWWTP (as in the national plan): 3.46Any relevant comment on UWWTP: The deadline will be updated with National investment plan, in fulfillment of the "unlocking conditions" according to the Multiannual Financial Framework 2021-2027