Agglomeration view on a map with some info UWWTP : Kanalizacia Harmanli - Identifier : BGCO77181_00_01 - Status : Active - Not connected - Reporting year : 2014 Region (NUTS) Code : BG42 - Region (NUTS) Name : Южен централен (Yuzhen tsentralen) compliance Time Line List of all the year available for the agglomeration 2012201420162018View history Compliant Not compliant Not relevant No information ? Description Load entering UWWTP (p.e.): load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)Not availableMethod used to determine the load : Not availableRate of entering load transported to this UWWTP by trucks (%): Not availablePhysical Capacity (p.e.): Not availableWaste water treated (m3/y): Volume of waste water treated and partially treated in the UWWTPNot availableMethod used to determine the volume of waste water treated: Not availableTreatment performance: BOD5: Biological Oxygen DemandNot availableTreatment performance: COD: Chemical Oxygen DemandNot availableTreatment performance: TSS: Total Suspended SolidsNot availableTreatment performance: Total nitrogen: Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitriteNot availableTreatment performance: Total phosphorus: Sum of dissolved phosphorus and insoluble phosphorusNot availableTreatment performance: Other: e.g. e-coliNot availableCompliance: Not compliantTreatment type in place: No informationTreatment required: More stringent treatment : Nitrogen and PhosphorusTreatment met: NoPerformance met: NoIn cause of failure: Bad operating/Bad design or dimensioning: 0In cause of failure: Bad design or dimensioning: 0In cause of failure: Further information on cause of failure: Not available Graphical network summary Agglomerations : 1 Agglomeration : Harmanli (Generated Kanalizacia Harmanli Entering :0 p.e 1 DCP(S)Discharge point: Kanalizacia HarmanliCatchment of Maritza river(CSA) Main treatment : : Compliant : Not compliant : No information / Not relevant More stringent treatment : Performance : : Pass performance : Fail performance : Not relevant Type : N : Nitrogen removal P : Phosphorus removal UV : UV treatment MICRO : Micro Filtration Type : CHLOR : Chlorination OZONE : Ozonation SAND : Sand filtration O : Other more stringent Discharge point : : Discharge point DCP(S) : Discharge point(s) Waste Water Network Connexions Linked agglomeration(s): HarmanliLinked receiving area(s): Catchment of Maritza riverLinked discharge point(s): Kanalizacia Harmanli Site information Year of data: 2014 Source of data: See sourcefile Other years : Year of data: 2018 Source of data: See sourcefile Year of data: 2016 Source of data: See sourcefile Year of data: 2012 Source of data: See sourcefile UWWTP national Internet hyperlink: Not available Characteristics Latitude : 41.92000000 Longitude : 25.92000000 Date of closing: Not providedExplanation for closing: Not providedID of the successor: Not providedPrimary treatment: Secondary treatment: N removal: P removal: UV: Ozonation: Sand filtration: Chlorination: Micro filtration: Other treatment: Other type of more stringent treatment: Not providedOther type of more stringent : 0ID of E-PRTR facility: Not providedAccidents: Remarks: Not provided Forward looking aspect Identified reason(s) for non compliance: absence ot WWTPMeasure(s) to reach the compliance needed for UWWTP: construction of WWTPLoad entering the UWWTP at the expected date of compliance (as planned): 24860Organic design capacity UWWTP (as planned): 24860Type of treatment UWWTP (as planned): 3NPDate or expected date of completion of preparatory measures (planning, design, etc): 01 January 2019Date or expected start date for works: 07 January 2020Date or expected date of completion of works: 31 December 2023Expected date of compliance (12 months of compliant samples) : 31 December 2024Forecast cost investment needed for the UWWTP (as in the national plan): 7.00Name of EU fund planned to be used UWWTP (if any): Cohesion fundAmount of (planned) EU funding needed: 6.00Any relevant comment on UWWTP: Project to be implemented after regional feasibility study