Agglomeration view on a map with some info UWWTP : Kanalizacia Sapareva banya - Identifier : BGCO65365_00_01 - Status : Active - Not connected - Reporting year : 2018 Region (NUTS) Code : BG415 - Region (NUTS) Name : Кюстендил (Kyustendil) compliance Time Line List of all the year available for the agglomeration 2012201420162018View history Compliant Not compliant Not relevant No information ? Description Load entering UWWTP (p.e.): load expressed in population equivalent shall be calculated on the basis of the maximum average weekly load entering the treatment plant during the year, excluding unusual situations such as those due to heavy rain (Article 4 of the Urban Waste Water Treatment Directive 91/271/CE)Not availableMethod used to determine the load : Not availableRate of entering load transported to this UWWTP by trucks (%): Not availablePhysical Capacity (p.e.): Not availableWaste water treated (m3/y): Volume of waste water treated and partially treated in the UWWTPNot availableMethod used to determine the volume of waste water treated: Not availableTreatment performance: BOD5: Biological Oxygen DemandNot availableTreatment performance: COD: Chemical Oxygen DemandNot availableTreatment performance: TSS: Total Suspended SolidsNot availableTreatment performance: Total nitrogen: Sum of total kjeldahl nitrogen (organic, ammonia and ammonium), nitrate and nitriteNot availableTreatment performance: Total phosphorus: Sum of dissolved phosphorus and insoluble phosphorusNot availableTreatment performance: Other: e.g. e-coliNot availableCompliance: Not relevantTreatment type in place: No informationTreatment required: Secondary treatmentTreatment met: NoPerformance met: NoIn cause of failure: Bad operating/Bad design or dimensioning: Not availableIn cause of failure: Bad design or dimensioning: Not availableIn cause of failure: Further information on cause of failure: Not available Graphical network summary Agglomerations : 1 Agglomeration : Sapareva banya (Generated Kanalizacia Sapareva banya Entering :0 p.e 1 DCP(S)Discharge point: Kanalizacia Sapareva banyaCatchment of Struma river(CSA) Main treatment : : Compliant : Not compliant : No information / Not relevant More stringent treatment : Performance : : Pass performance : Fail performance : Not relevant Type : N : Nitrogen removal P : Phosphorus removal UV : UV treatment MICRO : Micro Filtration Type : CHLOR : Chlorination OZONE : Ozonation SAND : Sand filtration O : Other more stringent Discharge point : : Discharge point DCP(S) : Discharge point(s) Waste Water Network Connexions Linked agglomeration(s): Sapareva banyaLinked receiving area(s): Catchment of Struma riverLinked discharge point(s): Kanalizacia Sapareva banya Site information Year of data: 2018 Source of data: See sourcefile Other years : Year of data: 2016 Source of data: See sourcefile Year of data: 2014 Source of data: See sourcefile Year of data: 2012 Source of data: See sourcefile UWWTP national Internet hyperlink: Not available Characteristics Latitude : 42.29491300 Longitude : 23.25817700 Date of closing: Not providedExplanation for closing: Not providedID of the successor: Not providedPrimary treatment: Not availableSecondary treatment: Not availableN removal: Not availableP removal: Not availableUV: Not availableOzonation: Not availableSand filtration: Not availableChlorination: Not availableMicro filtration: Not availableOther treatment: Not availableOther type of more stringent treatment: Not providedOther type of more stringent : Not providedID of E-PRTR facility: Not providedAccidents: Not availableRemarks: Not provided Forward looking aspect Identified reason(s) for non compliance: Absence of UWWTPMeasure(s) to reach the compliance needed for UWWTP: construction of WWTPLoad entering the UWWTP at the expected date of compliance (as planned): 8816Organic design capacity UWWTP (as planned): 8816Type of treatment UWWTP (as planned): 2Date or expected date of completion of preparatory measures (planning, design, etc): 31 December 2024Date or expected start date for works: 31 December 2025Date or expected date of completion of works: 31 December 2029Expected date of compliance (12 months of compliant samples) : 31 December 2030Forecast cost investment needed for the UWWTP (as in the national plan): 3.46Any relevant comment on UWWTP: The deadline will be updated with National investment plan, in fulfillment of the "unlocking conditions" according to the Multiannual Financial Framework 2021-2027