Beta Version : remaining inconsistencies are possible. They will be corrected during the next reporting exercise

Kanalizacia Buhovo - history

UWWTP : Kanalizacia Buhovo - Identifier : BGCO07140_00_01 - Status : Inactive
Region (NUTS) Code : BG411 - Region (NUTS) Name : София (столица) (Sofia (stolitsa))

2016

2018

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description

YearComplianceTreatment typeLoadTreatment performance
2016Compliance : Not relevant
Treatment met :
Performance met :
required :
in place : No information
Capacity:
0 p.e.From field <uwwCapacity> : Organic design capacity (p.e.)
Entering:
0 p.e.From field <uwwLoadEnteringUWWTP> : Load entering UWWTP (p.e.)
Load rate:
% <uwwLoadEnteringUWWTP> / <uwwCapacity> x 100
2018Compliance : Not relevant
Treatment met :
Performance met :
required :
in place : No information
Capacity:
0 p.e.From field <uwwCapacity> : Organic design capacity (p.e.)
Entering:
0 p.e.From field <uwwLoadEnteringUWWTP> : Load entering UWWTP (p.e.)
Load rate:
% <uwwLoadEnteringUWWTP> / <uwwCapacity> x 100

Agglomerations

Year
UWWTP capacity
Value define in <uwwCapacity> field for the UWWTP in the report file with definition : "Organic design capacity (p.e.)"
UWWTP Entering load
Value define in <uwwLoadEnteringUWWTP> field for the UWWTP in the report file with definition : "Load entering UWWTP (p.e.)"
Total of load collected by collecting systems and entering the UWWTPs
Sum of load adressed to UWWTP by linked agglomeration. The load addressed by an agglomeration to an UWWTP is calculated with the following formula : Generated load (p.e.) of the agglomeration (<aggGenerated>) x Rate of generated load of agglomeration collected through collecting system (% of p.e.) (<aggC1>) x % of load of agglomeration collected in collecting system and entering that treatmentplant (<aucPercEnteringUWWTP>)
Linked Agglomeration(s) with addressed load to the UWWTP
20160p.e.0p.e.0p.e.
20180p.e.0p.e.0p.e.
Notice : "UWWTP entering load" is based on measure of yearly average, "Total of load collected" is based on estimation of maximum over a year.

Discharge points

YearLinked Discharge point(s)
2016
2018