Chepintsi

Agglomeration view on a map with some info

Agglomeration : Chepintsi - Identifier : BGAG80409_00 - Status : Active - Reporting year : 2018
Region (NUTS) Code : BG411 - Region (NUTS) Name : София (столица) (Sofia (stolitsa))

compliance Time Line
List of all the year available for the agglomeration

2012

2014

2016

2018

 
Compliant
 
Not compliant
 
Not relevant
 
No information
 
?


Description
See diagram
Generated load (p.e.): 
Load generated by the agglomeration. It Includes load generated by resident and non-resident population (e.g. tourism), industrial and tertiary sectors connected to collecting system, rain under normal climatic conditions. It integrates Individual or Appropriate systems and seasonal variation.
2 578
Connected to collecting system: 
0.0 % (0 p.e.) based on estimated method
Individual or Appropriate Systems (IAS): 
80.0 % (2,062 p.e.) based on estimated method
Discharged without treatment: 
20.0 % (516 p.e.) based on estimated method
Methods used for calculation of the generated load: 
calculated
Significant changes of the generated load : 
false
Comments on significant changes: 

Not provided

Remarks: 
Updated information from Regional Feasibility Studies.
Generated Load by collection type in population equivalent
See the data table
Compliance: 
Not compliant
Connection compliance: 
Connection to "collecting system" or "Individual or appropriate system" as requested by Article 3 of the Urban Waste Water Treatment directive 91/271/EC
Not Compliant
2nd treatment compliance: 
Not Compliant
3rd treatment compliance: 
Not relevant
Article 6 compliance: 
Primary treatment
Not relevant
Distance to target:
The distance to target concept present the rate of waste water load that is:
  • adequately connected to a centralised urban waste water collecting system or addressed via Individual or Appropriate System (IAS)
and then when collected:
  • treated at an adequate level (secondary or more stringent treatment) as required by the directive,
  • and with the performance requirements under tables 1 or 2 of the annex I of Directive 91/271/EEC, (UWWTD).
When countries joined the EU, they have obtained a delay to implement the Directive. In such case the deadline for implementing the above (see in section characteristics) may be different, and if the above is not already implemented for the agglomeration it is identified with orange colour in the table.
Equipment Performance
Collection 20.0%
516 p.e
2nd treatment 20,0% 20,0%
516 p.e 516 p.e
3rd treatment - -
- -
Graphical network summary
Individual And Appropriate Systems: 2,062 p.e (80.0%)
Network
Network
Chepintsi
Generated load : 2,578 p.e
Collecting system :
0 p.e
(0.0%)
NetworkNetwork
Network
Load entering from:
Chepintsi
0 p.e (0.0%) 1
Network
Load entering from:
Chepintsi
0 p.e (0.0%) 2 3
Network
Network
N
Network
P
Network
CHLOR
Network
Network
Discharge without treatment: 516 p.e (20.0%)

Network
    Main treatment :
  • Network : Compliant
  • Network : Not compliant
  • Network : No information / Not relevant
    More stringent treatment :
    Type :
  • N : Nitrogen removal
  • P : Phosphorus removal
  • Other : Other more stringent
  • UV : UV treatment

    Type :
  • OZONE : Ozonation
  • SAND : Sand filtration
  • MICRO : Micro Filtration
  • CHLOR : Chlorination
    Discharge point :
  • Network : Discharge point
  • DCP(S) : Discharge point(s)
  • 1: value based on estimated method
  • 2: value based on estimated method
  • 3: with 80 % of generated load transported by trucks
Waste Water Network Connexions
Linked Treatment Plant(s): 
Linked discharge points: 
Linked receiving areas: 
ID of the big city/ big discharger: 

Not provided

Linked Big city(ies): 

Not provided

Site information
Characteristics
 42.75950000
 23.42860000
Name of municipalities/communes of this agglomeration: 

Not provided

Agglomeration begin life: 
Not available
Agglomeration end life: 

-

Deadline connection compliance: 
Deadline as regards the connection to "collecting system" or "Individual or appropriate system" as requested by Article 3 of the Urban Waste Water Treatment directive 91/271/EC
12/31/2014
Deadline 2nd treatment compliance: 
Deadline as regards the secondary treatment in place and performance met as requested by Article 4 and Annex I.B of the Urban Waste Water Treatment directive 91/271/EC
12/31/2014
Deadline 3rd treatment compliance: 
when agggenerated < 10000 set to Nor Relevant
Not Relevant
Type of sewage network: 
separated/combine/separated and combine
Not available
Leaks registration: 
Is a registration system for leaks in place?
Not available
Maintenance plan: 
Is a maintenance plan (quality assurance) in place?
Not available
ID of the successor: 

Not provided

Indicate number of overflows: 
Not available
How much raw sewage has been discharged through combined sewer overflows (CSOs) in the year reported: p.e.: 

Not provided

How much raw sewage has been discharged through combined sewer overflows (CSOs) in the year reported: m3/y: 

Not provided

What are the measures based on: Acceptable number of overflows per year: 

Not provided

What are the measures based on: Capacity in relation to dry weather flow: 

Not provided

What are the measures based on: Dilution rates: 

Not provided

IAS - in situ and/ or transported to UWWTPs by trucks: How much in % of generated load of agglomeration with more stringent trea: 
80.00 %
IAS - in situ and/ or transported to UWWTPs by trucks: How much in % of generated load of agglomeration with primary treatment: 
80.00 %
IAS - in situ and/or transported to UWWTPs by trucks: How much in % of generated load of agglomeration with secondary treatment: 
80.00 %
Is best technical knowledge to limit pollution applied?: 

Not provided

Pressure test: 

Not provided

Video inspection: 

Not provided

Other measures: 

Not provided

Short explanation of other measures: 

Not provided

Forward looking aspect
Identified reason(s) for non compliance: 
Absence of collection and IAS
Measure(s) foreseen to reach compliance with Article 3 (collecting systems and IAS): 
Building of a collecting system or IAS
Date or expected date for completion of preparatory measures for the collecting system or IAS (planning, design, procurement, c: 
31 December 2024
Start date or expected start date for works on the collecting systems or IAS: 
31 December 2025
Expected date of completion of the collecting system or IAS works: 
31 December 2030
Forecast investment cost for the collecting system or IAS (as in the national plan): 
28.83
Any relevant comment on collecting system or IAS: 
The deadline will be updated with National investment plan, in fulfillment of the "unlocking conditions" according to the Multiannual Financial Framework 2021-2027
Theorical compliance for art 5 if the Art 5.2,3 was applied: 
Theorical compliance for art 5 if the Art 5.2,3 was applied

Not provided